My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08844
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:52 PM
Creation date
10/12/2006 3:18:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.600.30 A
Description
Other Studies - Purgatoire River Transit Loss Study
State
CO
Basin
Arkansas
Water Division
2
Date
4/23/1954
Author
Corps of Engineers
Title
Purgatoire-Picket Wire River - Part II
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />O~1220 <br /> <br />. <br /> <br />. <br /> <br />.. <br /> <br />d. The Trinidad Reservo~r be operated by the Bureau of Recla- <br /> <br /> <br />mation for irrigation and other purposes in accordance with rules for <br /> <br /> <br />flood control prescribed by the Secretary of the Army. <br /> <br /> <br />e. The accumulation of stream flow records be continued at the <br /> <br /> <br />following stream gaging stations: On the Purgatoire River at Trinidad, <br /> <br /> <br />at Alfalfa, at Ninemile Dam, at Highland Dam and at the mouth; stream <br /> <br /> <br />gaging stations be established and records accllinulated on San Francisco <br /> <br /> <br />Creek at the mouth and Frijole Creek at the mouth or at such other <br /> <br /> <br />points as may prove to be necessary in the furtre; and that quality <br /> <br /> <br />of water samples be taken and records accumulated at the Alfalfa and <br /> <br /> <br />Ninemile Dam stations. <br /> <br /> <br />f. All necessary agreements or contracts be negotiated to per- <br /> <br /> <br />mit operation of the irrigation capacity of the Trinidad heservoir in <br /> <br /> <br />accordance with the conditions specified ~n recommendation c and to <br /> <br /> <br />provide for equitable distributimn and most efficient use of the water <br /> <br /> <br />supply made available by the project to all lands served by the proj- <br /> <br /> <br />ect. <br /> <br />g. Contracts be negotiated by the Secretary of the Interior, on <br />behalf of the United States, with a District or Districts representing <br />the project water users, prior to the start of construction, for the <br />delivery of water supplies at equitable prices which would pay annual <br />
The URL can be used to link to this page
Your browser does not support the video tag.