My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08844
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:52 PM
Creation date
10/12/2006 3:18:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.600.30 A
Description
Other Studies - Purgatoire River Transit Loss Study
State
CO
Basin
Arkansas
Water Division
2
Date
4/23/1954
Author
Corps of Engineers
Title
Purgatoire-Picket Wire River - Part II
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
221
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />O~1219 <br /> <br />. <br /> <br />. <br /> <br />~ <br /> <br />~ <br />I <br />, <br />~ <br /> <br />48. Under existing law and policy of the State of volorado a con- <br /> <br />, <br /> <br />servancy district should be established comprising all lands and real <br />property to be benefitted by the proposed irrigation development. The <br />net proceeds from an annual mill levy on all real property in the con- <br /> <br />servancy district should be used to supplement payments by water users. <br /> <br />49. To encourage efficient use of water and lands and to achieve <br /> <br />equitable contractual arrangements with the conservancy district and <br /> <br />the water users, water delivery charges or annual payments by the dis- <br /> <br />trict should be within the payment capacity of the water users, related <br /> <br />to quantities of water delivered, and varied according to annual changes <br /> <br />in agricultural prices. <br /> <br />,0. although ample capacity will be provided in Trinidad ~eservoir <br /> <br />for the deposition of sediment, sound land management and erosion control <br /> <br />should be undertaken in the Purgatoire River watershed, particularly in <br /> <br />any areas that may be major contributors of sediment. <br /> <br />RECOM1AENDATIONS <br /> <br />51. Recommendations.- It is recommended that: <br /> <br />a. The Trinidad Dam and Reservoir Project be constructed by <br /> <br />the Corps of ~ngineers for (l) flood control, (2) irrigation, (3) <br /> <br />such compatible uses as fish and wildlife preservation and rec- <br /> <br />reation if such uses are found to be economically justified, and <br />
The URL can be used to link to this page
Your browser does not support the video tag.