Laserfiche WebLink
<br />{} \I 11 'c~ '5 1 <br /> <br />St. Louis Creek <br /> <br />Mav 15 - Seotember 15 <br />10 cfs <br /> <br />Seotember 1 5 - Mav 14 <br />3 cfs <br /> <br />Vasquez Creek <br /> <br />8 cfs <br /> <br />3 cfs <br /> <br />FRlser/Jim Creek <br /> <br />10 cfs <br /> <br />4 cfs <br /> <br />Ranch Creek Canal <br /> <br />4 cfs <br /> <br />2 cfs <br /> <br />There are also a number of other bypass agreements with local water users on Vasquez Creek but <br />they are of minimal magnitude. <br /> <br />Other CROSS ConsiduRltions <br /> <br />For future operation scenarios in the CROSS WRPM, Denver has provided projected <br />monthly diversions from its own "baseline" model run for the Gumlick Tunnel (Williams Fork <br />Collection system) and total diversions through the Moffat Tunnel. The baseline scenario assumes <br />full use of Denver's existing system. These diversion time-series have been incorporated into the <br />CROSS database. <br /> <br />0-5 <br />