Laserfiche WebLink
<br />~M~~~ES,BRADFORD&SHPS - <br /> <br />ID:303-247-SS27 <br /> <br />FEB 16'96 <br /> <br />9:09 No.003 P.03 <br /> <br />Keith Rose and Patty Schrader <br />February IS, 1996 <br />Page 2 <br /> <br />exceed an annual maximum of 57,100 acre-feet in any year, as calculated at <br />the Bluff gage (located at Mexican Hat), until all the clements of this <br />reasonable and prudent alternative are completed and/or implemented. . . . <br />IIu"""..~., A reauirement hut only durinu the research pp.rind ht that if <br />Reclamation can provide a minimum winter flow out of Navajo Dam of <br />approximately 300 cfs on a rccwrlng basis such that the flexibility of operation <br />necessary to mimic a natural hydrograph can be maintained as demonstrated <br />by the model runs showing an availability of up to 300,000 acre-feet of water <br />for spring release for endangered fishes 96 percent of the time (as per the <br />1991 biological opinion), then and only then can Stage A be operated with <br />57,100 acre-feet as an average annual Anima~-T.lI PlaIa PrQject depletion. <br />TIJ~;;t;;;J a u''''i''':I\.IJlI,-,uLJ fu. Lt.... J~o:I'l;:lIl"'ll Y'-'J;vd. DevelopInent of preliminary <br />flow recommendations (provided hydrologic conditions allow) will occur in <br />1998 after the conclusion of the research. Navajo Dam operations would then <br />be based on these flows. <br /> <br />2. Reclamation has agreed to contribute funding to the San Juan River Basin <br />RecovCl}' Implementation Program, including funding for research necessary <br />to complete the objectives of the approximate 7 year research effort on the <br />San Juan River and its tributaries. The research is being conducted by <br />knowledgeable endangered species and habitat experts and is designed to <br />allow for testing of hypotheses. The ultimate goal of this research is to <br />characterize those factors which limit nlItiTc endanllered fish populations in <br />the San Juan River and to provide management options to conserve llnd <br />restore the endangered fish community. In order to complete the research <br />objectives, Reclamation agrees to provide all test flows rllQJlested bv the <br />. Riolo~ Committee and llPproved ily the Coordination Committee (tcst. flows <br />are based on hydrologic conditions for each water year). . . . After the <br />preliminary recommendations are developed, Reclamation will reinitiate <br />section 7 consultation to determine whether additional depletions are <br />vermi~~ihle for the AnimA~-T.3 Plaia Proiect. <br /> <br />3. Page 2 should be corrected to read: <br /> <br />3. Reclamation will continue to operate Navajo Dam under study guidelines <br />developed under clement 2 for the research period. Test flows will continue <br />to be provided to re-create a wide range of flow conditions including high <br />flows similar to 1987, when the hydrolol1Y allows which are hypothesized to <br />benefit reproduction and recruitment in the endangered fish community. <br />Release schedules will be determined by the Service and Reclamation based <br />on recommendations of the San Juan Recovery Implementati(1I1 Program's <br />