Laserfiche WebLink
<br /> <br />Salinity Control <br /> <br /> <br />Tangible evidence of salinity buildUp. <br /> <br />Progress on the four units authorized by the <br />Colorado River Basin Salinity Control Act <br />(Public Law 93.320. June 24, 1974) for fiscal <br />year 1982 is as follows: Construction on the <br />Grand Valley Stage I area is nearing comple- <br />tion. The remaining work primarily includes <br />placing 8 Y2 miles of laterals in pipe out of a <br />total of about 30 miles. Monitoring is continu- <br />ing to verify the salinity reduction resulting <br />from the construction program. Stage II investi- <br />gations are underway, including drilling holes <br />and testing soil and water to define salinity <br />mechanisms, and studying alternative plans to <br />reduce the flow of saline water to the river. <br /> <br />On the Paradox Valley Unit, specifications are <br />being prepared to award a contract for drilling <br />and testing a deep injection well. The contract <br /> <br /> <br />looking downstream along Government Highline Canal. <br /> <br />is scheduled to be awarded in fiscal year <br />1983. Another contract was awarded for <br />consulting services during the drilling and <br />testing operation of the deep well. Five addi. <br />tional ground water collection wells are being <br />drrlled In the well field for a total of 23 wells. <br /> <br />The status reporf on the Las Vegas Wash Unit <br />was completed in October 1982. It <br />recommends proceeding with construction of <br />a bypass channel to convey low salinity indus. <br />tfial waste water past an area of highly saline <br />soil, thus preventing ground water infiltration <br />and salt pickup. <br /> <br />The Crystal Geyser Unit has been deferred <br />indefinitely. <br /> <br />Feasibility studies are progressing on the 10 <br />salinity control units under Public Law 96.375. <br />The planning (feasibility) report for the Lower <br />Gunnison Basin Unit has been completed <br />Planning reports for the Uinta Basin, McElmo <br />Creek. and Big Sandy River Unit are scheduled <br /> <br /> <br />. <br />Aerial view of Grand Valley Field Station (White roof). <br /> <br />for completion in fiscal year 1984. Studies for <br />the Glenwood.Dotsero Springs, Price.san <br />Rafael Rivers, and Dirty Devil River are <br />continuing, but the planning reports are not <br />scheduled for completion until fiscal year 1985, <br />fiscal year 1986, and fiscal year 1987, <br />respectively. The Meeker Dome Un if is being <br />monitored to determine the effect of plu99in9 <br />the leaky oil and gas exploratory wells before <br />attempting further studies. Present indications <br />are that plugging the wells will eventually stop <br />most of the saline water flowing into the river. <br /> <br />No further studies are expected on the <br />LaVerkin Springs or Lower Virgin River units <br />since the concluding reports were completed. <br /> <br />9 <br />