Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1"'(.11. 3~8 <br />~j '! 1 ). ,J <br /> <br />adjustments necessary to reflect the canopy cover on two of the three <br /> <br /> <br />parcels, result in no parcels retaining a positive residual repayment <br /> <br /> <br />capacity. Thus, no parcels in the Piedra Watershed should receive <br /> <br /> <br />further consideration as PIA. <br /> <br /> <br />6.0 Conclusions <br /> <br /> <br />The preliminary analysis of potentially irrigable parcels in the <br /> <br /> <br />Piedra Watershed identified three parcels as potential PIA. A Level B <br /> <br /> <br />economic analysis of these parcels resulted in the elimination of all <br /> <br /> <br />three of them from further consideration. These parcels, totalling <br /> <br /> <br />only 204 acres in size, could not be economically farmed given the <br /> <br /> <br />water delivery charges necessary to irrigate them. <br /> <br />9 <br /> <br />,t _J., -,- <br />