My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08776
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:36 PM
Creation date
10/12/2006 3:15:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
Statewide
Date
1/31/1995
Author
South Platte Working
Title
A Vision for the South Platte River
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c <br /> <br />18 <br /> <br />B.8 Replace pedestrian and maintenance <br />bridges <br /> <br />Responsible lor making this happen: <br />Denver Parks and Recreation (Contact: Neil 5perandeo, <br />964-2536 ) <br />Urban Drainage and Flood Control District (Contact: Ben <br />U rbonas, 455-6277) <br /> <br />Time lrame: Beginning in 1995. <br /> <br />Briel description and background: <br />The six pedestrian/ maintenance bridges crossing the <br />Platte in Denver need to be replaced and a systematic <br />maintenance and replacement program established. In <br />replacing most of the bridges, abutments can remain. <br />Under some circumstances, parts of bridges could serve <br />as fishing platforms. <br /> <br />Location: Along the River corridor. <br /> <br />Benelits: The bridges need to be replaced because they <br />are in poor condition. New bridge design will reduce the <br />icy conditions now common on the bridges due to the <br />shadows cast by the heavy bridge structures. <br /> <br />Resources: <br />Urban Drainage will cost share: 375%, Denver could <br />ha ve $200-300,000 to spend on this per year over severa I <br />years. <br />Denver is requesting funds starting with the 1996 budget <br />for this purpose. Urban Drainage is also requesting <br />funds to match Denver (at the 375% match) It is estimat- <br />ed that, on average, it would cost approximately <br />$150,000 per bridge for superstructure replacement. <br />Other possible funding will be explored. <br /> <br />Next Steps: <br />Determine schedule for bridge replacement. <br /> <br />'ft,,,c'-atjl.Jt~ '200(J: A Vi~hm ("". the S"uth 'Platte 'RilJCI' <br />
The URL can be used to link to this page
Your browser does not support the video tag.