My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08772
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:35 PM
Creation date
10/12/2006 3:15:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
10/1/1953
Author
USDOI/BOR
Title
Supplemental Report on Colorado River Storage Project and Participating Projects, Upper Colorado River Basin, October 1953
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Col. 7 <br /> <br />Col. <br />Col. <br />Col. <br /> <br />Col. 14 <br /> <br />" <br /> <br />pRELIMINARY mCRElmITAL ANALYSIS <br />COLORADO RIVER STORAGE PROJECT mlITS <br /> <br />10-8-53 . <br />Cost of <br />Cost of ste8lll <br />power power <br />delivered tomest <br />to SBlllll <br />market market <br />Jol.ills r kwh <br />12 13 <br /> <br />Specific Annual operation, <br />Allocation of power Power maintenance, and <br />;joint costs costs Total Cost costa reolacement <br />To To incl~ power roassign- assipned At site assigned net <br />irrigation power transmission cost mente to unit costs costs costs <br />Million Dollars thousand dollars <br />4 5 7 8 9 10 <br /> <br />Average <br />annual <br />salable <br />energy <br />(millim <br />kwh <br />11 <br /> <br />Benefit <br />Cost <br />Ratios <br />14 <br /> <br />2 <br /> <br />3 <br /> <br />Project <br />Unit <br />(In assumed <br />order of <br />construction <br />1 <br />nlITIU UlUTS <br />Glen Canyon 50.3 141.7 <br />Echo Park 48.0 76.8 <br />DATA' ON UNITS IN ULTDlATE PLAN <br />Cross ~jountain 13.'9 19.4 <br />Split ~,Iountain <br />Jray C~on <br />Flaming Gorge <br />Curecanti* <br />Crystal <br />W'nitewater <br />TOTAL <br />NOTES: <br />Col. 6 <br /> <br />Incremental power plant and transmission line costs reassigned among thll project units in accordance with the energy <br />credited ',0 each site. <br />Total power costs assigned to each unit including allocated joint costs, POWBrplant, transmission, and interest <br />during construction. <br />10 The est imated annual cost of operation, lIIlIintenance, and replacement assigned to each unit. ~ '" <br />11 Average annual salable generation credited to each unit during 50 ye&"8 of full operation.'. <br />12 Hill rate required to reoay all costs allocated to power at each unit, including interest during construction, inj <br />years of full operation with 2~% interest charred on the unpaid balance. ' <br />The benefit-cost, ratios shown are based on primary DOwer benefits only but give consideration to the expected use <br />life of facilities extending beyond 50 years by the present value of the ettimated salvage after 50 years. <br /> <br />9.2 <br />28.9 <br />30.3 <br /> <br />127.4 <br />39.8 <br />40.9 <br /> <br />.0 <br />185. <br /> <br />20. <br /> <br />. <br /> <br />* Capacity 2,500,000 acre-feet. <br /> <br /> <br />229.3 371.0 -16.9 382.0 4802 -336 44h6 381.3 4.7 7.3 1.71 <br />,1.6 128.4 -.5 137.5 ll55 ..J.O 1145 1017 5.9 7.3 1.42. <br />16.9 36.3 3.7 296 75 371 376 5.G 7.3 1.65 <br />84.4 84.4 7.2 644- l44 788 6l.3 6.5 7.3 1.26 <br />54.3 181.7 6.0 l2l2 121 1333 1186 7.1 7.3 1.15 <br />14.3 54..1 .9 36l. 17 381 388 6.4 7.3 1.36 <br />14.8 55.7 1.7 376 35 4ll 308 8.4 7.3 1.01; <br />40.9 40.9 -1.2 325 -26 299 227 7.9 7.3 1.00 <br />18. 60 ~ 2 1.0 <br />525. 81 <br /> <br /> <br />52912 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.