My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08737
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:28 PM
Creation date
10/12/2006 3:14:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1963
Author
Water Development Co
Title
Review of Site Selection Criteria Narrows and Weld County Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />EXbrook 7-4071 <br /> <br />CABLE. INTERENGCO <br /> <br />I <br /> <br />IEC-0INTERNATIONAL ENGINEERING COMPANY. INC. <br />, 74 NEW MONTGOMERY STREET '---;-'.SAN-FR-:;;;;;CISCO 5 . CALIFORNIA <br /> <br />October ll, 1963 <br /> <br />I <br /> <br />I <br /> <br />Water Development Committee <br />Weldon, Riverside and Bijou Irrigation Systems <br />P. O. Box 455 <br />Fort Morgan, Colorado <br /> <br />I <br /> <br />I <br /> <br />Attention: Mr. Earl W. Haffke, Legal Counsel <br /> <br />I <br /> <br />Subject: Letter Report - Review of Site Selection Criteria <br />Narrows and Weld County Projects. <br /> <br />Gentlemen: <br /> <br />I <br /> <br />In accordance with discussions with you on September 30, Mr. A. A. <br /> <br />Stone, Chief Design Engineer and Mr. C. B. King, Project Engineer of <br /> <br />I <br /> <br />International Engineering Company visited Fort Morgan and Denver from <br /> <br />I <br /> <br />October 1 through October 4. The purpose of this visit, and of this report, <br /> <br />is to assist you in verifying your concepts of optimum lOcation of a major <br /> <br />I <br /> <br />dam planned by the Bureau of Reclamation for construction on the South <br /> <br />Platte River west of Fort Morgan. <br /> <br />I <br /> <br />After consideration of all potential sites in this reach of the <br /> <br />I <br /> <br />South Platte, the Bureau's studies were concentrated at two locations, the <br /> <br />Narrows site west of Fort Morgan, and the Weld County site, 24 miles upstream <br /> <br />I <br /> <br />of the Narrows site. The Bureau has tentatively selected the Narrows site <br /> <br />as the most economical location for this dam. <br /> <br /> <br />This decision places the dam downstream of the present intakes <br /> <br />to the Riverside, Bijou and Empire irrigation systems, and inundates the <br /> <br />irrigated lands of the Weldon system. Total acreage of these systems make <br /> <br />up 28% of the land potentially serviceable by a major storage dam on this <br /> <br />reach of the South Platte. Your organization contends that the regional <br /> <br />interest would be better served by the Weld County dam location, which <br /> <br />would not only supply your systems and preserve the Weldon system, but <br />
The URL can be used to link to this page
Your browser does not support the video tag.