Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />The junior water rights within the Carve Out will not be called out by the instream flow right. <br />1 unior water rights developed in excess of the Carve Out may be called out. <br /> <br />The second portion of the development allowance is provided by the Modifiable Portion <br />(Paragraph 4) of the instream flow appropriation for development in excess of the Carve Out. <br /> <br />The Modifiable Portion, consisting of approximately 72,000 af is distributed on the following <br />basis: <br /> <br />Month <br />cfs <br /> <br />Apr May Jun Jul <br />302 644 242 0 <br /> <br />When the Carve Out is used up on either a monthly or annual basis, the Board may convert <br />the Modifiable Portion (or part of it) from instream flow protection to consumptive uses. <br /> <br />Instream Flow Components <br /> <br />The instream flow right consists of flow in excess of the Carve Out up to the appropriated <br />amount and consists of three componenls: <br /> <br />I) A base flow component during the non runoff months at the 80% exceedance level; <br />2) A Modifiable Portion (Paragraph 4) which may be converted by the Board from instream <br />flow protection to consumptive uses. This Modifiable Portion provides the means of <br />protecting the second level of development allowance which will be available for future <br />consumpti ve uses, and <br />3) A "Non-modifiable" Portion (Paragraph 3) which consists of water that flows out of <br />Colorado because of compact limitations (modifiable only with consent of the FWS under <br />Paragraph 3 of the Enforcement Agreement). <br /> <br /> Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep <br />Base Flow 88 172 157 187 221 305 125 45 <br />Para. 4 302 644 242 0 <br />Para. 3 247 1M 163 112 114 ill 5262 2.2Q1 8838 3230 ill 197 <br />ISF Rt. 335 336 320 299 335 694 5564 10151 9080 3230 520 242 <br /> <br />The Modifiable and Non-modifiable concept is more fully described in Paragraphs 3 and 4 of <br />the Enforcement Agreement. <br /> <br />Administration <br /> <br />The Base Flow component will not be subordinated to junior water rights. A call will be <br />placed whenever the flow at the Maybell gage is less than the Base Flow component. <br /> <br />Oplion I - 2 <br />