<br />wou Id pump from the reservoir and discharge to a tunnel and
<br />pipeline system to be constructed jointly with the DWB. As in
<br />PIa<1 E, the reservoir would permit year-round pumping at a
<br />unIform pumping rate of 74 mgd. Under Plan F, the pumping
<br />head would average 510 feet as contrasted with 1,300 feet under
<br />Plan D and 1,400 feet under Plan E,
<br />
<br />I
<br />I
<br />I
<br />I
<br />
<br />A new electrical transmission line approximately 0.4 miles long
<br />would be required to supply electric power to the pumping
<br />station. This would connect to the relocated 115 kV transmission
<br />line presently paralleling U_ S, Highway 24.
<br />
<br />Costs for the pumping station would be divided equally between
<br />the Cities and DWB.
<br />
<br />e, A system of tunnels and pipelines extending from the pump-
<br />ing station northeasterly B8,000 feet to discharge into Ten Mile
<br />Creek tributary to the DWB Dillon Reservoir. A part of the
<br />tunnel and pipeline system would also serve the DWB Eagle-Piney
<br />and Roberts Tunnel Collection Systems.
<br />
<br />I
<br />I
<br />I
<br />
<br />Commencing at the pumping station in 6-d, a 60 inch pipeline
<br />would extend 5.000 feet to a point in the southwest quarter of
<br />Section 20, Township 6 South, Range 80 West. At this point,
<br />the pipeline would connect with the proposed Red Cliff Tunnel
<br />extending north-northeasterly 12,000 feet to a portal in the
<br />southwest quarter of Section 15, Township 6 South, Range 80
<br />West, Commencing at this portal, a 60 inch pipeline would
<br />extend 2,000 feet to the upstream portal of the DWB proposed
<br />Turkey Creek Tunnel. Water diversions from the DWB proposed
<br />Roberts Tunnel Collection System including Turkey, Wearyman
<br />!''''llnd Lime Creeks would be delivered to the Turkey Creek Tunnel
<br />~t this point.
<br />o
<br />Turkey Creek Tunnel would extend northeasterly 32,000 feet to
<br />a point in the northwest quarter of Section 28, Township 5
<br />South, Range 79 West, and at this point would join the DWB
<br />proposed Vail Pass Tunnel. Additional DWB diversions from the
<br />Roberts Tunnel Collection System would be delivered to the Vail
<br />
<br />I
<br />I
<br />
<br />1
<br />I
<br />
<br />Pass Tunnel at this point by the connecting Gore Creek Tunnel.
<br />
<br />From th!,! juncture of the Turkey Creek and Gore Creek Tunnels,
<br />the Vail Pass Tunnel would extend easterly 37,000 feet to its
<br />outlet portal on Ten Mile Creek near the east quarter corner of
<br />Section 33, Township 5 South, Range 78 West. From this portal,
<br />all waters would flow in Ten Mile Creek to Dillon Reservoir.
<br />
<br />All costs for this tunnel and pipeline system would be prorated
<br />to the Cities and the DWB on the basis of water allocations
<br />tributary to the various portions of the system.
<br />
<br />7. Plan F-1 - Tunl1els, Pipelines, Reservoir, and Pumping
<br />
<br />Plan F-1 is similar to Plan F, except a joint undertaking would
<br />be required between the Cities and the CRWCD for Cross Creek
<br />Tunnel and Iron Mountain Reservoir, Also a joint undertaking
<br />would be required between the Cities and the DWB for Turkey
<br />Creek and Vail Pass Tunnels. No direct relationship would exist
<br />between the CRWCD and DWB. Plan F-1 includes:
<br />
<br />v
<br />
<br />o
<br />
<br />,
<br />I
<br />
<br />a. A tunnel from Homestake Valley, beginning near the center
<br />of Section 30, Township 6 South, Range 80 West, extending
<br />northwesterly 24,000 feet, passing beneath Fall Creek and Peter-
<br />son Creek and terminating below Cross Creek Valley at elevation
<br />9,050. Riser shafts and diversion facilities would be provided at
<br />Fall, Cross, and Peterson Creeks. The diversion point on Cross
<br />Creek would be downstream of the mouths of West and East
<br />Cross Creeks and would permit all diversion from Cross Creek to
<br />be made at one location. The Cities would bear the entire tunnel
<br />cost from Cross Creek to Fall Creek. From Fall Creek to Iron
<br />Mountain Reservoir, the CRWCD would share part of the cost as
<br />it would divert water from Fall and Peterson Creeks. The total
<br />tunnel cost would be prorated approximately 87 per cent to the
<br />Cities and 13 per cent to the CRWCD.
<br />
<br />/,
<br />
<br />r
<br />
<br />t,
<br />;1
<br />tl
<br />~
<br />
<br />b. Iron Mountain Reservoir on Homestake Creek with a dam
<br />near the center of Section 30, Township 6 South, Range 80