<br />1 <br />1 <br />I. <br /> <br />wou Id pump from the reservoir and discharge to a tunnel and <br />pipeline system to be constructed jointly with the DWB. As in <br />PIa<1 E, the reservoir would permit year-round pumping at a <br />unIform pumping rate of 74 mgd. Under Plan F, the pumping <br />head would average 510 feet as contrasted with 1,300 feet under <br />Plan D and 1,400 feet under Plan E, <br /> <br />I <br />I <br />I <br />I <br /> <br />A new electrical transmission line approximately 0.4 miles long <br />would be required to supply electric power to the pumping <br />station. This would connect to the relocated 115 kV transmission <br />line presently paralleling U_ S, Highway 24. <br /> <br />Costs for the pumping station would be divided equally between <br />the Cities and DWB. <br /> <br />e, A system of tunnels and pipelines extending from the pump- <br />ing station northeasterly B8,000 feet to discharge into Ten Mile <br />Creek tributary to the DWB Dillon Reservoir. A part of the <br />tunnel and pipeline system would also serve the DWB Eagle-Piney <br />and Roberts Tunnel Collection Systems. <br /> <br />I <br />I <br />I <br /> <br />Commencing at the pumping station in 6-d, a 60 inch pipeline <br />would extend 5.000 feet to a point in the southwest quarter of <br />Section 20, Township 6 South, Range 80 West. At this point, <br />the pipeline would connect with the proposed Red Cliff Tunnel <br />extending north-northeasterly 12,000 feet to a portal in the <br />southwest quarter of Section 15, Township 6 South, Range 80 <br />West, Commencing at this portal, a 60 inch pipeline would <br />extend 2,000 feet to the upstream portal of the DWB proposed <br />Turkey Creek Tunnel. Water diversions from the DWB proposed <br />Roberts Tunnel Collection System including Turkey, Wearyman <br />!''''llnd Lime Creeks would be delivered to the Turkey Creek Tunnel <br />~t this point. <br />o <br />Turkey Creek Tunnel would extend northeasterly 32,000 feet to <br />a point in the northwest quarter of Section 28, Township 5 <br />South, Range 79 West, and at this point would join the DWB <br />proposed Vail Pass Tunnel. Additional DWB diversions from the <br />Roberts Tunnel Collection System would be delivered to the Vail <br /> <br />I <br />I <br /> <br />1 <br />I <br /> <br />Pass Tunnel at this point by the connecting Gore Creek Tunnel. <br /> <br />From th!,! juncture of the Turkey Creek and Gore Creek Tunnels, <br />the Vail Pass Tunnel would extend easterly 37,000 feet to its <br />outlet portal on Ten Mile Creek near the east quarter corner of <br />Section 33, Township 5 South, Range 78 West. From this portal, <br />all waters would flow in Ten Mile Creek to Dillon Reservoir. <br /> <br />All costs for this tunnel and pipeline system would be prorated <br />to the Cities and the DWB on the basis of water allocations <br />tributary to the various portions of the system. <br /> <br />7. Plan F-1 - Tunl1els, Pipelines, Reservoir, and Pumping <br /> <br />Plan F-1 is similar to Plan F, except a joint undertaking would <br />be required between the Cities and the CRWCD for Cross Creek <br />Tunnel and Iron Mountain Reservoir, Also a joint undertaking <br />would be required between the Cities and the DWB for Turkey <br />Creek and Vail Pass Tunnels. No direct relationship would exist <br />between the CRWCD and DWB. Plan F-1 includes: <br /> <br />v <br /> <br />o <br /> <br />, <br />I <br /> <br />a. A tunnel from Homestake Valley, beginning near the center <br />of Section 30, Township 6 South, Range 80 West, extending <br />northwesterly 24,000 feet, passing beneath Fall Creek and Peter- <br />son Creek and terminating below Cross Creek Valley at elevation <br />9,050. Riser shafts and diversion facilities would be provided at <br />Fall, Cross, and Peterson Creeks. The diversion point on Cross <br />Creek would be downstream of the mouths of West and East <br />Cross Creeks and would permit all diversion from Cross Creek to <br />be made at one location. The Cities would bear the entire tunnel <br />cost from Cross Creek to Fall Creek. From Fall Creek to Iron <br />Mountain Reservoir, the CRWCD would share part of the cost as <br />it would divert water from Fall and Peterson Creeks. The total <br />tunnel cost would be prorated approximately 87 per cent to the <br />Cities and 13 per cent to the CRWCD. <br /> <br />/, <br /> <br />r <br /> <br />t, <br />;1 <br />tl <br />~ <br /> <br />b. Iron Mountain Reservoir on Homestake Creek with a dam <br />near the center of Section 30, Township 6 South, Range 80 <br /> <br />17 <br /> <br />" <br />