My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08712
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08712
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:21 PM
Creation date
10/12/2006 3:10:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.700
Description
Miscellaneous Small Projects and Project Studies - Homestake Project
State
CO
Basin
Arkansas
Water Division
2
Date
4/25/1974
Author
Black and Veatch
Title
Environmental Impact Report - Homestake Water Collection System Extension for Aurora and Colorado Springs with related documents Volume I
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tain, thence easterly 7.000 feet to a point beneath Fall Creek <br />Valley, A riser shaft and diversion facilities would be provided <br />similar to those at Cross Creek. <br /> <br />d, Section 4. a tunnel extending from the point on Section 3 <br />beneath Notch Mountain at which point the tunnel angles in a <br />northwesterly direction, 9,000 feet to a point beneath East Cross <br />Creek Valley. A riser shaft and diversion facilities would be <br />provided similar to those at Cross Creek. <br /> <br />e. Section 5, a 66 inch gravity pipeline extending 3,000 feet <br />from the tunnel portal' at Fancy Creek to a point near the north <br />portal of Missouri Tunnel to provide capacity to convey the total <br />Cross Creek Tunnel flow to Missouri Tunnel. The Cross Creek <br />flow would initially be conveyed from Fancy Creek portal to the <br />Missouri Tunnel by the existing Fancy-French gravity conduit, <br />but as additional streams are diverted, the conduit capacity <br />would be exceeded and the additional 66 inch parallel conduit <br />would be required. <br /> <br />f, A pipeline and other facilities to collect Eagle-Arkansas Divi- <br />sion water as described under l-f. <br /> <br />3. Plan C - Tunnels and Pipeline <br /> <br />Plan C includes: <br />a, A tunnel extending 26,000 feet northwesterly from the vicin- <br />ity of Fancy Creek Diversion Dam. passing beneath Cross Creek <br />and terminating beneath West Cross Creek Valley at elevation <br />10,400, Riser shafts and diversion facilities would be provided at <br />Cross and West Cross Creeks. <br /> <br />b. A 72 and 78 inch pipeline connecting to the Fancy-French <br />conduit at the French Creek diversion and traversing the western <br />slope of Homestake Valley in a northeasterly direction 22,000 <br />feet, terminating at elevation 10,400, Diversion facilities would <br />be provided at Whitney Creek and at other unnamed streams <br />crossed by the pipeline. <br /> <br />14 <br /> <br />c. A tunnel commencing at the end of the pipeline in 3-b <br />extending northwesterly 23.000 feet, passing beneath Fall Creek <br />and terminating beneath East Cross Creek Valley at elevation <br />10,450. Riser shafts and diversion facilities would be constructed <br />at Fall Creek and East Cross Creek. 0 <br />,&:l. <br />,&:l. <br />d. A 72 inch pipeline commencing near the inlet of the Mis.,.~ <br />souri Tunnel and paralleling the existing Fancy-French gravity <br />conduit 3,000 feet in a northerly direction to the portal of the <br />tunnel under 3'a. I nitial flows under this diversion would be <br />routed into the Fancy-French conduit. Ultimate development <br />would overload the Fancy-French conduit and the additional 72 <br />inch parallel conduit would be required, <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />e. A pipeline and other facilities to collect Eagle-Arkansas <br />Division water as described under 1.f. <br /> <br />4. Plan 0 - Tunnel, Pumping, and Pipeline <br /> <br />Plan D includes: <br />a. A tunnel from Homestake Valley, beginning near the center <br />of Section 30, Township 6 South, Range 80 West. extending <br />northwesterly 24,000 feet, passing beneath Fall Creek and Peter- <br />son Creek and terminating below Cross Creek Valley at elevation <br />9,200. Riser shafts and diversion facilities would be provided at <br />Fall, Cross, and Peterson Creeks. The diversion point on Cross <br />Creek wou Id be downstream of the mouths of West and East <br />Cross Creeks and would permit all diversion from Cross Creek to <br />be made at one location. <br /> <br />b. A 78 inch gravity pipeline from the Homestake Valley portal <br />of the tunnel in 4-a extending south and southwesterly 30,000 <br />feet up Homestake Valley to elevation 9,050 to supply the <br />pumping station under 4-d. <br /> <br />c. An electric transmission line connecting to the eXisting 115 <br />thousand volt (kV) transmission line which parallels U, S, High- <br />way 24 and extending 3.8 miles southwesterly up Homestak"e <br />
The URL can be used to link to this page
Your browser does not support the video tag.