My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08693
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08693
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:17 PM
Creation date
10/12/2006 3:10:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1976
Title
Report of the Rio Grande Compact Commission 1976
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~,,,"'.;,<~_,:,,:,,~, ~'h","'~<""""'-' <br /> <br />--~ ".~ <br /> <br />I"?, <br />>~. <br />,:j <br />(.;.;; <br />C) <br />9 <br /> <br />26 <br /> <br />RIO GRANDE COMPACT CO~tISSION REPORT <br /> <br />RECORDS OF DELIVERIES AND RELEASES <br /> <br />At the annual meeting of the Compact Commission on March 24, 1977, <br />the records of deliveries and releases for calendar year 1976 were <br />examined and the computations of debits and credits based thereon were <br />reviewed. The records and computations as reviewed by the Commission <br />are reproduced on the next three pages. <br /> <br />The delivery of water in the Rio Grande at the Colorado-New Mexico <br />State line was obtained from record of streamflow near Lobatos, Colo- <br />rado; the obligation of Colorado to deliver water at the State line was <br />computed as prescribed in Article III. Item C5, the Reduction of <br />Debits prescribed in Article VI, was computed in accordance with the <br />Rules and Regulations. <br /> <br />The delivery of water by New Mexico to Project Storage was com- <br />puted from the actual streamflow record and the record of operation <br />of Elephant Butte Reservoir; the scheduled delivery was computed as <br />prescribed in the Resolution of the Commission adopted at the Tenth <br />Annual Meeting, and published in this report. Item NM5, Reduction <br />of Credits by Evaporation, was computed in accordance with the Rules <br />and Regulations. The creation of a minimum recreation pool in <br />Elephant Butte Reservoir was initiated in December 1975 and is <br />in accordance with a resolution adopted May 3, 1974. <br /> <br />The actual release from Project Storage during the year was <br />measured at stations below Caballo Dam. The Accrued Departure from <br />Normal Release is an under-release but is omitted in accordance with <br />a decision of the Commission at the meeting on February 15, 1968. <br /> <br />~ <br />, <br /> <br />. <br /> <br />" <br />~ <br /> <br />~\' <br />i' <br />, <br />~~ <br />fij <br />~ <br />~ <br />i1 <br />"~ <br />,.,~ <br />~..~ <br />:-1':' <br />~~, <br />-..-~l <br />~-r~,. <br />,J~ <br />.~,1! <br />~)~ <br />."p <br />,~ <br /> <br />,~~, ;:".i~~ <br />tc' ,',' ", .~;~I <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />: ~......,,~-:.~ ,~~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />n-'~, <br />~;,;r; <br /> <br /> <br /> <br /> <br /> <br />~~~;:; <br /> <br />l~ <br /> <br />r~....~'''...j'~'''.r...,.~y~ <br />~~7~{.:t~;~;~_~J~ <br />--,."-b....,.~~}.:,>i <br /> <br />mill <br />
The URL can be used to link to this page
Your browser does not support the video tag.