Laserfiche WebLink
<br />o {) () 5f; <br /> <br />Cost Allocation and <br />Non-Federal Reimburse- <br />ment for Flow Augmentation: Question workability of cost <br />allocation method and oppose <br />non-Federal reimbursement for <br />flow augmentation to enhance <br />Environmental Quality objective. <br /> <br />CONSIDER FEASIBLE ALTERNATIVES <br /> <br />General: <br /> <br />All alternatives should be fully <br />considered in project planning. <br /> <br />Flood Plain Zoning: <br /> <br />Nonstructural flood plain zoning <br />should be used for flood control <br />in lieu of structural flood control. <br /> <br />Recycle Water: <br /> <br />Consider implementation of <br />r ecyc ling techno logy in lieu of <br />structural measures and direct <br />releases. <br /> <br />RESTORE SOCIAL WELL-BEING OBJECTIVE <br /> <br />Social well-being should be <br />restored to a full planning <br />objective. <br /> <br />PROGRAM COVERAGE AND COORDINATION <br /> <br />Coverage of Agency Projects: <br /> <br />Which agencies and/or programs <br />and projects should be added to <br />or exempted from coverage of <br />the Principles and Standards. <br /> <br />Separate Planning from <br />Construction: <br /> <br />One agency should not have the <br />authority to plan and also have <br />the authority to construct a <br />project. <br /> <br />Agency Coordination: <br /> <br />Problems with Federal, regional, <br />State, and local group coordina- <br />tion and planning responsibilities <br />and authorities. <br /> <br />5 <br />