Laserfiche WebLink
<br />San Juan-Chama <br />Water Accounting <br />Albuquerque Area Office <br />December 1995 <br /> <br />The natural inflow into Heron Reservoir during the month of December was computed <br />to be 150 acre-feet (af) as shown on Table 3. Net San Juan-Chama losses were <br />250 af as shown on Table 2. There were no diversions through Azotea Tunnel this <br />month. <br /> <br />There was a total of 150 af of natural released in the form of seepage in December <br />from Heron. There was no San Juan-Chama water released in December. <br /> <br />Total precipitation at Heron Reservoir was 0.26 inches which is 20% of normal. The <br />monthly computations for Heron Reservoir are summarized in Tables 1-3. <br /> <br />In-Oecember a total of 12,307 af was released from MRGCD's pool in EI Vado as <br />payback to the City of Albuquerque (City) in Abiquiu. 252 af was released for Santa <br />Fe in Abiquiu for depletions at Otowi (6 af above Otowi, 246 af below Otowi, SEO <br />letters of 12/12/95 and 12/22/95). 6 af was borrowed from City in Abiquiu for Taos <br />depletions above Otowi, SEO letter 11/29/95. 59 at was borrowed from City in <br />Abiquiu tor Bernalillo for depletions at Otowi, SEO letter 12/4/95. The remaining 139 <br />af will be delivered from Bernalillo's 1995 Heron allocation by the end of April 1996. <br />1,339 af was borrowed from City in Abiquiu for the Cochiti Recreational Pool. <br /> <br />At the end of December, MRGCO's balance owed to the City was 25,312 af, for <br />water borrowed to meet irrigation demands. <br /> <br />Total inflow into Nambe Falls Reservoir was computed to be 237 af. Evaporation loss <br />on the reservoir was 1 af. Table 4 summarizes San Juan-Chama water at Otowi. <br /> <br />Estimated sediment deposition in the San Juan-Chama pools at Abiquiu and Jemez <br />Canyon Reservoirs, and Cochiti Lake are presented in Tables 5A-5C. <br /> <br />Storage and evaporation of Rio Grande water in EI Vado and Abiquiu Reservoirs are <br />shown on Table 6. <br /> <br />All data are provisional and subject to revision as final data are collected and analyzed. <br />