My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08624
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:59 PM
Creation date
10/12/2006 3:07:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.400
Description
Lower Colordo River Multi-Species Management Program
Basin
Colorado Mainstem
Date
12/1/1994
Author
SWCS Envir. Consult.
Title
Final Feasibility Assessment for a Multi-Species Management Program Lower Colorado River
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7. Alternative G: Modified Habitat Conservation Plan <br /> <br />This approach is complex, may take a long time to develop, and may be costly to develop <br />relative to the other alternatives. However, in the long tenn, it would offer the advantages of <br />each of the alternatives it incorporates, Because the Modified HCP alternative includes an He?, <br />it would allow the Participants to take a leadership role in the compliance process, would pelmit <br />involvement by many interests (particularly Native American tribes), and would provide <br />incidental take authorization under Section lO(a), Because this alternative includes a multi- <br />species RlP, it would provide a comprehensive, coordinated conservation strategy appropriate <br />to an aquatic environment. Because it includes a Programmatic Section 7 agreement, it would <br />provide a mechanism for efficient, pro forma Section 7 consultations, Because it includes <br />legislation, it would provide a delineated, circumscribed, and enforceable funding program, as <br />well as the strongest possible statutory foundation, Invoking Section 6 of the ESA adds a <br />supplementary, if very limited, funding strategy. Section 6 agreements will bring concomitant <br />responsibilities and commitments, All these features combine to provide the greatest planning <br />certainty and assured operational flexibility of any alternative, <br /> <br />Like the HCP alternatives, the Modified HCP has the potential to transfonn the results of <br />Reclamation's BA into a collaborative process potentially more advantageous to Participant <br />interests. <br /> <br />8. Conclusion <br /> <br />These alternatives provide a range of options, with a range of costs, benefits, and disadvantages, <br />It is not the purpose of this document to make a recommendation, but rather to report <br />infonnation that will assist decision makers in understanding the relative effectiveness and <br />feasibility of the compliance strategies available to them. <br /> <br />FINAL REPORT <br /> <br />December 20, 1994 <br />Page xix <br />
The URL can be used to link to this page
Your browser does not support the video tag.