My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08624
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:59 PM
Creation date
10/12/2006 3:07:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.400
Description
Lower Colordo River Multi-Species Management Program
Basin
Colorado Mainstem
Date
12/1/1994
Author
SWCS Envir. Consult.
Title
Final Feasibility Assessment for a Multi-Species Management Program Lower Colorado River
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br /> <br />for determining adequate mitigation measures to compensate for assumed incidental take would <br />have to be worked out between the HCP steering committee and the Service, <br /> <br />The HCP process could incorporate and/or address the results of Reclamation's BA, By signing <br />the MOD with the Lower Division States, the Department of the Interior has made a <br />commitment to support a cooperative effort for ESA compliance on the Lower Colorado River. <br />The Service would probably respond very favorably to an initiative by the Participants in this <br />regard, <br /> <br />The second, more inclusive HCP alternative (E-2), would better meet the Participants' <br />compliance needs than the first (E-l), but would also be more costly and time-consuming to <br />develop and implement. <br /> <br />6. Alternative F. Legislation <br /> <br />This approach takes the compliance process into the political arena where the D.S, Congress can <br />direct or redirect the purpose and objectives of federal regulatory actions, On the other hand, <br />the legislative route opens' Lower Colorado River management concerns to widespread scrutiny, <br />Given the dynamics of congressional action, with each senator and representative pursuing his <br />or her own agendas, even forces unrelated to the substance of the bill could prevent its passage <br />or redirect its focus, Exemption from the ESA is not considered a viable alternative; therefore, <br />the legislation would have to incorporate some kind of conservation plan that would ensure ESA <br />compliance, Developing an effective plan-in fact, developing the entire piece of legislation- <br />would be at least as complicated as putting together a RlP or an HCP, <br /> <br />Developing the legislation and marshalling support for its passage could entail a considerable <br />investment in time, effort, and money, with no guarantee of success, In this respect, relying <br />on an act of Congress involves more risk of invested resources than any other alternative (except <br />perhaps litigation), At the end of the process, Participants could find that they are no further <br />toward achieving their goals than when they began. However. if the effort were successful and <br />a well structured legislated comprehensive conservation strategy Nere in place, project planning <br />certainty would be very high from that point forward, The possibility exists that Reclamation <br />and the Service would be amenable to a legislative solution and would participate in its <br />development, <br /> <br />FINAL REPORT <br /> <br />December 20. 1994 <br />Page xviii <br />
The URL can be used to link to this page
Your browser does not support the video tag.