<br />OO~fl~
<br />
<br />PROJECT COSTS
<br />
<br />.
<br />.
<br />
<br />PL-566 Funds
<br />
<br />Other Funds
<br />
<br />Total
<br />
<br /> ; Dollars Percent pollars Percent Dollars Percent
<br /> '.
<br />Management .
<br /> .
<br />Practices
<br />Irrigation Water 0 310,000 100 310,000 100
<br />ManaQement
<br />Nutrient 0 465,000 100 465,000 100
<br />Management
<br />Residue 0 60,000 100 60,000 100
<br />Manacement
<br />Pest Management 0 15,000 100 15,000 100
<br />Enduring
<br />Practices
<br />Ditch Lining 641,500 50 641,500 50 1,283,000 100
<br />(concrete)
<br />Gated Pipe 315,000 50 315,000 50 630,000 100
<br />Pipeline 930,000 50 930,000 50 1,860,000 100
<br />Land Levelinc 630,000 50 630,000 50 1,260,000 100
<br />Water Control 144,000 50 144,000 50 288,000 100
<br />Structures
<br />Hvdrants 14,400 50 14,400 50 28,800 100
<br />Alfalfa Valves 36,000 50 36,000 50 72,000 100
<br />Gated Pipe SurQe 38,400 50 38,400 50 76,800 100
<br />SurQe Valve 66,000 50 66,000 50 132,000 100
<br />Polvacrvlamide 30,000 50 30,000 50 60,000 100
<br />Feedlot Pit 42,000 50 42,000 50 84,000 100
<br />Feedlot Diversion 9,000 50 9,000 50 18,000 100
<br />Mitication 50,000 50 50,000 50 100,000 100
<br />Technical 1,685,700 100 0 1,685,700 100
<br />Assistance
<br />Administrative 320,300 95 16.900 5 337.200+@ 100
<br />Costs ;WG
<br />Total Costs 4,952,300 3,813,700 8,765,500
<br />
<br />1.Il~
<br />
|