Laserfiche WebLink
<br />OO~fl~ <br /> <br />PROJECT COSTS <br /> <br />. <br />. <br /> <br />PL-566 Funds <br /> <br />Other Funds <br /> <br />Total <br /> <br /> ; Dollars Percent pollars Percent Dollars Percent <br /> '. <br />Management . <br /> . <br />Practices <br />Irrigation Water 0 310,000 100 310,000 100 <br />ManaQement <br />Nutrient 0 465,000 100 465,000 100 <br />Management <br />Residue 0 60,000 100 60,000 100 <br />Manacement <br />Pest Management 0 15,000 100 15,000 100 <br />Enduring <br />Practices <br />Ditch Lining 641,500 50 641,500 50 1,283,000 100 <br />(concrete) <br />Gated Pipe 315,000 50 315,000 50 630,000 100 <br />Pipeline 930,000 50 930,000 50 1,860,000 100 <br />Land Levelinc 630,000 50 630,000 50 1,260,000 100 <br />Water Control 144,000 50 144,000 50 288,000 100 <br />Structures <br />Hvdrants 14,400 50 14,400 50 28,800 100 <br />Alfalfa Valves 36,000 50 36,000 50 72,000 100 <br />Gated Pipe SurQe 38,400 50 38,400 50 76,800 100 <br />SurQe Valve 66,000 50 66,000 50 132,000 100 <br />Polvacrvlamide 30,000 50 30,000 50 60,000 100 <br />Feedlot Pit 42,000 50 42,000 50 84,000 100 <br />Feedlot Diversion 9,000 50 9,000 50 18,000 100 <br />Mitication 50,000 50 50,000 50 100,000 100 <br />Technical 1,685,700 100 0 1,685,700 100 <br />Assistance <br />Administrative 320,300 95 16.900 5 337.200+@ 100 <br />Costs ;WG <br />Total Costs 4,952,300 3,813,700 8,765,500 <br /> <br />1.Il~ <br />