Laserfiche WebLink
<br />OO~412 <br /> <br />Principal Project Measures: <br /> <br />.1 <br />1;"( <br /> <br />It is expected that 250 long-term land treatment contracts will be written during the <br /> <br />project's life. Approximately 31,000 acres will be treated through project action. <br /> <br />Practices to be installed for this project action include: <br /> <br />31,000 acres with irrigation water management & nutrient management. <br /> <br />1,000 acres of pest management. <br /> <br />6,000 acres residue management. <br /> <br />190,000 ft. of ditch lining <br />310,000 ft. of pipelines <br />210,000 ft. of gated pipe <br /> <br />3,600 ac. of land leveling <br /> <br />240 water control structures <br /> <br />4,000 acres of polyacrylamides <br /> <br />80 Hydrants <br /> <br />400 alfalfa valves <br /> <br />25,600 ft. gated pipe for surQe irriaation <br /> <br />80 surge valves <br /> <br />50 acres of wetland habitat development <br /> <br />3 feedlot pits <br /> <br />3 feedlot diversions <br /> <br />lZ~ <br />