Laserfiche WebLink
<br />0047 <br /> <br />Document <br /> <br />Grant i ng <br /> <br />Mitigation Measures <br /> <br />Easement Stipulations, contd. <br /> <br />ES 9* <br />contd. <br /> <br />ES 10* <br /> <br />ES 11* <br /> <br />ES 12 <br /> <br />ES 13* <br /> <br />originally forested. To inhibit erosion and to add organic <br />matter to the soil, chipped tree slash and underbrush will be <br />stockpiled and spread over the restored areas. (FEIS Section <br />2.4.1, page 2-35 and 2-36) <br /> <br />[1,2,5.6,9,lOJ <br /> <br />Access roads along the pipelines and to tunnel portals will be <br />constructed to planned grades and will be graded and drained to <br />inhibit erosion. No roads will be constructed in the Holy Cross <br />Wilderness. (FEIS, Section 2.4.1, page 2-36) <br />[1,2,5,6,9,10J <br /> <br />Excess tunnel muck not needed for mitigation of Phase I of the <br />Homestake Project will be deposited in approved disposal areas <br />outside the Wilderness, compacted and shaped to designed natural <br />contours, and then covered with a minimum of six inches of top- <br />soil material from excavated areas. The surfaced area will then <br />be fertilized and revegetated as described in Construction Stip- <br />u1ation,8.b. (FEIS Section 2.4.1, page 2-36) <br />[1.2,5.6,9,lOJ <br /> <br />In right-of-way surveys and construction (Stipulation 5), the <br />Grantee will selectively remove trees designated by the Forest <br />Service to avoid having a straight line appearance. (FEIS <br />Section 2.4.1, page 2-37) <br /> <br />[1,2,5.6,9,lOJ <br /> <br />The Grantee will cover all diversion structures except for access <br />hatches, the spillway, and the main water entrance with earth or <br />native material. Native materials will be used for riprap embank- <br />ments. All new pipelines will be buried, unless Forest Service <br />approves otherwi se, for safety or envi ronmenta 1 reasons. (FEIS <br />Section 2.4.1, page 2-35) <br /> <br />All exposed structures will be a non-specular color or composed <br />of a material that will blend in with the surrounding natural set- <br />ting. All exposed concrete will require a color additive. (FEIS <br />Section 2.4.1, page 2-36) <br /> <br />[1,2,9,lOJ <br /> <br />ES 14 The Grantee will replace wildlife habitat capacity lost because <br />of innudation or disturbance. Wil d1 ife habitat miti gation wi 11 <br />be accomplished by the proponent in the general vicinity of the <br />project, but outside the Wilderness boundary. Required improve- <br />ments will be coordinated by the Forest Service with the Colorado <br />Division of Wildlife and projected lost habitat capacity will be <br />replaced in locations specified prior to the start of project <br />development. (FEIS Section 2.4.1, page 2-35) <br />[l,2.9,10J <br /> <br />3 <br />