Laserfiche WebLink
<br />0046 <br />Granting <br />Document <br /> <br />Easement Conditions, contd. <br /> <br />Mitigation ,Measures <br /> <br />EC 25 <br /> <br />EC 26 <br /> <br />EC 28* <br /> <br />Prior to the start of construction, the Grantee will develop and <br />implement a Water Quality Maintenance and Monitoring Plan to <br />ensure that project activities, or facilities do not cause water <br />quality to violate stream water quality standards established by <br />the State of Colorado. This PJan will be approved by the Forest <br />Supervisor prior to its implementation. The Plan will be updated <br />and revised as necessary every five years. (FEIS Section 2.4.1, <br />page 2-37) <br /> <br />[l,2,3,5,6,7,9,10J <br /> <br />The Grantee will relocate the East Cross Creek trail to route <br />visitors around the diversion site prior to the start of <br />construction activities. (FEI~ Section 2.4.1, page 2-37) <br />: [l,2,5,6,9,10J <br /> <br />The Grantee will operate diversion structure gates and valves by <br />remote control to minimize the need for travel to the sites, and <br />will design the structures to be as vandal-proof as possible to <br />minimize the need for repair crews to be transported to the site. <br />(FEIS Section 2.4.1, page 2-35) <br /> <br />[1,2,6,9,10] <br /> <br />Easement Stipulations (ES): <br /> <br />ES 6 <br /> <br />ES 7 <br /> <br />ES 9* <br /> <br />The Grantee will conduct site-specific geologic investigations <br />prior to any construction activity. If hazard areas are identi- <br />fied, modification of project; design or development of mitiga- <br />tions, as appropriate, will b~ required. (FEIS Section 2.4.1, <br />page 2-37) <br /> <br />[1,2,5,6,7,9,10] <br /> <br />Cultural and historical survey !for areas not already surveyed <br />(see FEIS Section 3.1.14) will be completed on areas where <br />surface disturbance will take place in accordance with 36 CFR 800 <br />and Executive Order 11593. (FEIS Section 2.4.1, page 2-37) <br />[1,2,5,6,9,10] <br /> <br />At the conclusion of construcHon operations, temporary access <br />roads, mobilization and operation areas, parking areas, pipeline <br />easements, diversion sites, d*m sites, spoil areas, and other <br />areas scarred by construction Will be restored and revegetated in <br />a manner satisfactory to the Forest Service. Construction sites <br />will be restored as nearly as possible to their original condi- <br />tion. Construction scars will be covered with the best available <br />topsoil within the immediate a.rea or with subsoil material from <br />excavated areas, fertilized, a,nd seeded with native grasses and <br />mulched. Seedling trees will: be planted in areas that were <br /> <br />2 <br />