My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08562
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:43 PM
Creation date
10/12/2006 3:04:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.700
Description
Miscellaneous Small Projects and Project Studies - Homestake Project
State
CO
Basin
Arkansas
Water Division
2
Date
5/16/1983
Author
USDA Forest Service
Title
Record of Decision for Homestake Phase II Project Final Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, , <br /> <br />00 t\ ,i <br /> <br />.~ <br /> <br />28. ARCHEOLOGICAL DISCOVERY: <br /> <br />If, during excavation work, items of archeological or paleontological <br />value are discovered, or a known de~osit of such items is disturbed, <br />the Grantee will cease excavation ir, the area so affected. He will <br />then notify the Forest Servi ce and I wi 11 not resume excavation unti 1 <br />wri tten approva 1 is gi ven. I . 1 <br /> <br />29. CDRNER PROTECTION: <br /> <br />The Grantee shall protect all survey monuments, benchmarks, wi tness <br />corners, reference and other monuments, and bearing trees, against <br />destruction, obliteration, and dama~e. If any monument or corner is <br />in an area subject to disturbance orldestruction, the monumentlwi11 be <br />referenced by a registered land surv~yor in such a manner that it can <br />be replaced within 0.1 foot of its original position and properly <br />recorded in compliance with Colorado Revised Statutes 38-53-101 <br />through 38-53-112 (1973). <br /> <br />30. VIOLATIONS OF OPERATING PLAN OR CONSTRUCTION STAGE STIPULATIONS: <br /> <br />I <br />If conditions of the Operating Plan pr the Construction Stage Stipula- <br />tions are violated, the Forest Supervisor or his designated represent- <br />ative may order immediate temporary suspension of any project activity. <br />Corrective action, as required by. the Forest Supervisor, may be <br />ordered as deemed necessary. <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.