My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08562
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:43 PM
Creation date
10/12/2006 3:04:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.700
Description
Miscellaneous Small Projects and Project Studies - Homestake Project
State
CO
Basin
Arkansas
Water Division
2
Date
5/16/1983
Author
USDA Forest Service
Title
Record of Decision for Homestake Phase II Project Final Environmental Impact Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br />, <br /> <br />0031 <br /> <br />West Cross Creek <br />Main Cross Creek <br />East Cross Creek <br />Fall Creek <br /> <br />- 5 cfs <br />- 4 cfs <br />- 3 cfs <br />- 3 cfs <br /> <br />In order to accomplish the environmental maintenace instream <br />flows, the Grantee will design diversion structures to allow a <br />permanent and unadjustab1e flow to bypass the structures to <br />ensure that required environmental maintenance flows are always <br />provided. This diversion structure design will also ensure that <br />required environmental maintenance flows are provided prior to <br />allowing water to enter the diversion pipeline. (FEIS Section <br />2.4.1, pages 2-35 and Appendix E) <br /> <br />24. The Grantee will remove, as necessary, sediments trapped behind <br />diversion dams through diversion tunnels to approved upland <br />disposal sites outside the Wilderness. (FEIS Section 2.4.1, <br />page 2-37) <br /> <br />25. Prior to the start of construction, the Grantee will develop and <br />implement a Water Quality Maintenance and Monitoring Plan to <br />ensure that project activities or facilities do not cause water <br />quality to violate stream water quality standards established by <br />the State of Colorado. This Plan will be approved by the Forest <br />Service prior to its implementation. The Plan will be updated <br />and revised as necessary every five years. (FEIS Section 2.4.1, <br />page 2-37) <br /> <br />, <br />26. The Grantee will relocate the East Cross Creek trail to route <br />visitors around the diversion site prior to the start of <br />construction activities. (FEIS Section 2.4.1, page 2-37) <br /> <br />27. Mitigation of the effects of the project on threatened and <br />endangered species of wild 1 ife wi 11 be compl eted by the Grantee, <br />as specified in Appendix I of the FEIS, prior to the diversion of <br />\'later. <br /> <br />28. The Grantee will operate diversion structure gates and valves by <br />remote control to minimize the need for travel to the sites, and <br />will design the structures to be as vandal-proof as possible to <br />minimize the need for repair crews to be transported to the site. <br />(FEIS Section 2.4.1, page 2-35) <br /> <br />29. The Grantee will comply with the attached Construction Stage <br />Stipulations consisting of clauses contained on the attached <br />pages numbered 14 through 22, which are hereby made a part of <br />this grant. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.