Laserfiche WebLink
<br />OO'jQ <br /> <br />d. <br /> <br />The Missouri Creek trailhead will be relocated and rebuilt <br />to provide centralized access to all trails initiating near <br />the Missouri Creek area. (fEIS Section 4.1.17, page 4-56) <br /> <br />Revegetation will be start~d on Phase I facilities, including <br />access roads, diversion dams, and pi pel ine routes, where <br />adequate vegetative cover is lacking. These areas will be <br />reseeded, and if necessary, topsoil and fertilizer will be <br />used. (FEIS Section 4.1.17, page 4-54) <br /> <br />The disturbed areas adjac~nt to existing Phase I diversion <br />structures wi 11 be revegatated and stocked wi th seed1 ing <br />trees. The diversion stru~tures will be modified to be less <br />obtrusive and to blend into natural surroundings. Disturbed <br />stream channels below Phas~ I diversions will be revegetated <br />and restored to a more natural condition. (FEIS Section <br />4.1.17, pages 4-54 and 4-58) <br /> <br />Instream flow bypasses will be provided on all Phase I <br />streams as follows: (FEIS Section 4.1.17, pages 4-54 <br />through 4-57) <br /> <br />Existing Phase I diversion structures will be modified to <br />, <br />ensure that the required, bypass flows pass the diversion <br />structures at all times. <br /> <br />e. <br /> <br />f. <br /> <br />g. <br /> <br />Sopr;s Creek Diversion Dam <br />Missouri Creek Diversion Dam <br />Fancy Creek Diversion] Dam <br />French Creek Diversion Dam <br />East Fork Homestake Creek Diversion Dam <br />Middle Fork HomestakelCreek Diversion Dam <br />Homestake Creek at GoJd Park <br /> <br />2 cfs <br />3 cfs <br />1 cfs <br />1 2/3 cfs <br />2 2/3 cfs <br />6 cfs <br />24 cfs <br /> <br />h. As construction commences on Phase II, the following addi- <br />ti ona 1 miti gation wi 11 be ,performed on Phase I, and wi 11 be <br />completed by the time Phas~ II is completed. <br /> <br />1) Tunnel muck will be ~~aced as a top priority in upland <br />areas over the existlng and proposed conduits between <br />French Creek and the, Mi ssouri Tunnel. The muck wi 11 <br />then be shaped to designed natural contours, covered <br />with a minimum of four inches of topsoil, and revege- <br />tated with native grasses and seedling trees. <br /> <br />2) Tunnel muck will be placed over the diversion conduits <br />spanning Missouri Cr~ek to form a small recreational <br />impoundment. <br /> <br />23. In order to minimize damage to: fish and wildlife, and otherwise <br />protect the environment, the following environmental maintenance <br />instream flow bypasses will be required at all times: (FEIS <br />Section 4.1.2, pages 4-3 through 4-5) <br /> <br />8 <br />