My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08504
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08504
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:28 PM
Creation date
10/12/2006 3:01:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.E
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/20/1982
Title
Comments re: Planning Report on the West Divide Project - Colorado
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />, <br /> <br />00 <br />C) <br /> <br />r- <br /> <br />,\1 <br /> <br />A REVIEW OF THE WEST DIVIDE PROJECT <br /> <br />Prepared by <br />The David E. Fleming Company <br />for the <br />West Divide Water Conservancy District <br /> <br />October 22, 1982 <br /> <br />GENERAL <br /> <br />The most recent project report prepared by the Bureau of <br />Reclamationl! presents the results of advance planning <br />studies made since the West Divide Project was authorized. <br />Several modifications have been made in the project plan <br />since the time of authorization but all were considered to <br />be within the scope of the project as authorized by Con- <br />gress. That most recent report i ncl uded updated phys i ca 1 <br />data and revi sed fi nancia 1 and economi c ana lyses based on <br />requirements of the project authorizing act and current <br />federal policies relating to water resource developments. <br /> <br />As directed by the West Divide Board of Directors, The David <br />E. Fleming Company of Denver, Colorado, acting as engineer <br />for the District, has reviewed the May 1982 report to <br />determine if project costs could be reduced sufficiently <br />through a combination of non-federal and federal design and <br />construction responsibil ities to result in a current <br />benefit-cost ratio greater than unity. In accordance with <br />the Board's understanding of the national administration's <br />proposed policy, this review assumed that required local <br /> <br />1/ Planning Report on the West Divide Project, <br />Colorado; May, 1982. <br /> <br />A-I <br />
The URL can be used to link to this page
Your browser does not support the video tag.