Laserfiche WebLink
<br />Benefit-Cost Ratio <br /> <br />The benefit-cost ratio is the ratio of <br />the present value of project benefits <br />- the increase in net income provided <br />by making additional water available <br />- to the present value of project <br />costs. <br /> <br />Benefit-cost ratio <br /> <br />.5 <br /> <br />.48 <br /> <br />.40 <br /> <br /> <br />o <br /> <br />I.A <br /> <br />I.B <br /> <br />J-e <br /> <br />I.D <br /> <br />II.A <br /> <br />II.B <br /> <br />II.D <br /> <br />II1-A II1-B III-D III-E <br /> <br />II1-F IV-A <br /> <br />. <br /> <br />No benefit-colt ratio could be eetimBted <br />becaule there Bre no project COlltS. <br /> <br />16 <br />