Laserfiche WebLink
<br />, ..OOa9~S <br /> <br />.~>~.~::~e:.:~::~:.~~~ <br /> <br /><.. <br /> <br />YELLOWTAIL UNIT - Lower Bighorn Division <br /> <br />~~;f;i~~;/~ <br /> <br />........". ,-', <br /> <br />The Yellowtail Unit, located on the Bighorn River, Big Horn County, <br />Montana, consists of Yellowtail Dam, Powerplant, and Afterbay Dam. <br /> <br />;:': :'~.~-~:. ..... . <br /> <br />The dam is a concrete-arch structure approximately 520 feet high <br />at the maximum section, and 1,450 feet long at the crest. Four l2-foot- <br />diameter penstocks, two 7-foot-diameter outlet pipes, and one 9-foot <br />6-inch diameter pipe outlet is embedded in the concrete of the dam. A <br />28-foot-diameter concrete-lined diversion tunnel, approximately 860 feet <br />long, was constructed in the left abutment and connects to the spillway <br />tunnel. About 1,240 feet of the downstream portion of the spillway <br />tunnel was used during the diversion period. The spillway, located on <br />the left abutment of the dam, consists of an unlined inlet channel, an <br />intake structure with two 25-foot by 64-foot radial gates, a concrete- <br />lined tunnel transition section, a concrete-lined 32-foot-diameter <br />tunnel, and a stilling basin. <br /> <br />}\.;:~~~~.:;~'.;'::;:';.: ~;.: <br />c..;;......:...:......... <br />:.\::'::"S ?: ;:. ..:t.=-;. <br />:::<:~.;.t:::.. ;::'::>< <br />:.:." .....;::.:.:,....:,. <br /> <br />The powerplant, located at the toe of the dam, accommodates four <br />generating units with a capacity of 62,500 kilowatts each, driven by a <br />87,500-hp. hydraulic turbine. <br /> <br />: ",.:..-. :. .~.- . - <br />;."-.:.."-:-': .::~.::/..; <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />. '.. ....."."....1 <br /> <br />im{'~~~;.~j;t: I <br /> <br />The multipurpose dam provides a reservoir of 1,375,000 acre-feet <br />to regulate runoff for irrigation, flood control, power generation, and <br />municipal water. Benefits also will be provided for fish and wildlife <br />and recreation. <br /> <br />Program FY 1968 <br /> <br />Funds available - $3,926,625 <br />Continue grouting and spillway <br />modifications on Yellowtail <br />Dam. <br />Construct retaining wall on <br />right abutment. <br /> <br />Accomplishments FY 1968 <br /> <br />Expenditures - $2,427,174 <br />Grouting contract 50% complete and <br />spillway modification contract <br />69% complete. <br />Contract for retaining wall 15% <br />complete. <br /> <br />,.....,.1 <br /> <br />~.;,;.: .' .;. ':-.~ <br />.......,......... <br /> <br />. . , . <br />....',.' .:.'." <br /> <br />.:: -:.". :~. .'. <br />;.>;:;'-~:':\ >:.;.. '-~::. <br />):<r:--..: .".. <br />'~:.J.: '. . ,;. .-:_~.-:'" '.". <br /> <br />.. ...... <br />'. "-. <br /> <br /> <br />.",:" <br /> <br />.> <br /> <br />24 <br /> <br />.... :. <br /> <br />. '. ," _ ~-:'.:.':.i: ",.~:; <br />