My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08473
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:21 PM
Creation date
10/12/2006 3:00:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.07.D
Description
Dominguez Reservoir Project
State
CO
Basin
Gunnison
Water Division
4
Date
1/28/1982
Title
CWCB: Agenda Item 7 February 5 1982 Board Meeting--Dominguez Reservoir Project
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C'-J <br />~ <br />~ <br /> <br />c::. <br /> <br />In beth ?lans a conve~cio~l po~erpl~nt w~uld be <br />si Lu3ted at the bdse of thE" rl.1m. Those plnncs <br />would have a max1~um ~apacity of 18 and 36 megn- <br />.....atts respectively 3nd .~cI11d product! about <br />136,000,000 a~d 159.000,000 kUh ot energy annually <br />respectively. The pumpback peak-demand powerplant <br />~nd reservoir (Rim Basin Reservoir) would be con- <br />structed about 800 feet above Dominguez Reservoir <br />and <!bollt 9 miles up$trea~J from Dominguez Dam. <br />These facilities ~~uld ha~e a capacity of 500 <br />megawatts. <br /> <br />Rim 83sin Reservoir would be created <br />Ri~ Basin Dam around a natural basin <br />canyon riQ above the Cunnison River. <br />,"auld be a horseshoe-shaped structure <br />emhankment of zoned earthfill. <br /> <br />by building <br />on the east <br />The dam <br />with an <br /> <br />A J:lultile....el outlet ,,'orks would be built at Domin- <br />guez D~m (either size) to permit control of do~~- <br />streae water temperature. thus ~~intaining n~tive <br />fish habitat. Some riparian lands ~ould be ac- <br />quired and developed upstream from Dominguez <br />Rese~vQir co Roubideau Creek and downstream from <br />th~ dam to the Rcdlands Power Canal Diversion <br />Dam. Ie either plan. b3ck~ater areas and nesting <br />structu'l"CS would be developed for fish and wild- <br />lif~. and wildlife zoning would be establish~d a- <br />round portions of the reservoir for the protec- <br />ti~n of c~rt3in s?ccies such as the bald eagle. <br /> <br />Municip,:l! .Jnd industrial water from the project <br />(ultimat~ capacity 74 cfs) would help meet the <br /> <br />D('lr.tin~II~Z <br /> <br />Rl>.o;~rv"": r :'r.' !"."C <br />Jalluary-. iSd-2~- <br />ragl" ~ llC :! <br /> <br />needs of anticipated popul.'ltion inc'rea~es in the <br />Grand Valley orea and would bl? prClvicl.:-c in eiC:'81' <br />pIon. <br /> <br />Attractive recreational and f'ishin; cpportllnities <br />are expected since the 1'03xilJum T(>scr....oir fluctu'.!- <br />tion would be limitEd to about 20 feet in the <br />?eaking Power Plan and 61 feet in the X&I Plan. <br />Recreacional facilities would b~ provided at <br />several sites on Dominguez Reservoir, while <br />picnic and rafting facilities would be devel- <br />oped on the river dowllstrea~. A visitor center/ <br />museum would be constructed to explain chc ~roj- <br />ect and iaterprec and display cultural resources <br />of the area. <br /> <br />Construction of the project would necessit3te re- <br />location of the Denver and Rio Grande W~stern ~il- <br />road to a new alignment roughly par~llel to U.S. <br />Highway 50 between Whitewater and Delta in both <br />plans. In addition a small portion of U.S. High- <br />way 50 would be relocated araund the Kannah Cre~k <br />arm of the larger Dominguez ReservQir. <br /> <br />Transmisstion lines would be ~onstructed from <br />Dominguez Dam Pumping/Po~crplant to th~ switch- <br />yard and from Rim Basin Pumping/Cenerating Flant <br />to the switchyard in the pe3kin; pow~r plen. <br />Existing transmission sys:ecs ~~uld be us~d to <br />transmit the po.er to Co3vrado Rivet Storage <br />Project delivery points. The Department of <br />Enerey W~stern Area Pow~r Aaministr~tion wou:d <br />be responsible for tr~n~mis~lon and marketing <br />of pO'der. <br />
The URL can be used to link to this page
Your browser does not support the video tag.