My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08458
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08458
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:18 PM
Creation date
10/12/2006 2:59:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.751
Description
Colorado River Operations
Basin
Colorado Mainstem
Date
1/1/2002
Author
USDOI/BOR
Title
Draft Environmental Impact Statement Vol 1 Implementation Agreement, Inadvertent Overrun and Payback Policy and Related Federal Actions
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />Table ES-l, Summary of Potential Impacts of the Execution of the lA, Adoption of the lOP, and Implementation of Biological <br />.:;: Conservation Measures (Page 20 of 29) <br />... <br />o <br />~ <br />" <br />~ <br />"- <br />:<l <br />" <br />;;- <br />;;r <br />"- <br />~ <br />"- <br />" <br />~ <br />" <br /> <br />;,. <br />" <br />- <br />o. <br />~ <br />'" <br />,." <br />... <br />VI <br /> <br />ReSDllrcdfSStlt' No Action Impacts of Proposed Action/Alternatives <br /> SOCIOECONOMICS <br />Biological Conservation Measures <br />Potential for change to population, housing or None. Constructing or restoring backwaters would create a <br />socioeconomics from restoration or creation of small, short-term increase in employment <br />44 acres of backwaters along the Colorado River opportunities_ This measure potentially could result <br />between Parker Dam and Imperial Dam. in the loss of 44 acres of agricultural land, <br /> depending on the site(s) selected. This could result <br /> in the loss of some agricultural employment <br /> opportunities. <br />Potential for change to population, housing or None. Constructing or restoring habitat would create a <br />socioeconomics from restoration or creation of small, short-term increase in employment <br />up to 1,116 acres of southwestern willow opportunities. This measure potentially could result <br />flycatcher habitat along the Colorado River. in the loss of up to 1,116 acres of agricultural land, <br /> depending on the site(s) selected. This could result <br /> in the loss of some agricultural employment <br /> opportunities. <br /> ENVIRONMENTAL JUSTICE <br />Implementation Agreement <br />Potential (or a disproportionate impact on any None. A slight lowering of the surface water elevation <br />low-income and minority populations from along the Colorado River between Parker and <br />decreased water levels of the Colorado River Imperial Dams would have an impact on biological <br />between Parker Dam and Imperial Dam. resources. These changes w.ould occur throughout <br /> this reach of the River, impacting each community <br /> in an approximately equal fashion, and would not <br /> have a disproportionate impact on any low-income <br /> and minority populations. <br /> <br />t:l <br />,." <br />... <br />VI <br />I <br />- <br />" <br />~ <br />~ <br />" <br />~ <br />..... <br />c <br />c <br />..... <br /> <br />tT1 <br />(f) <br />, <br />,'-' <br />'" <br /> <br />t:' <br />" <br />g <br />- <br />;:;. <br />" <br />~ <br />~ <br />:I <br />" <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.