My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08432
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08432
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:10 PM
Creation date
10/12/2006 2:58:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
12/10/1982
Title
Narrows Fact Sheet No.2 December 1982
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />3 <br /> <br />A review of hydrologic data was conducted earlier this year. Analyses of <br /> <br /> <br />updated information based on longer term records resulted in a minor <br /> <br /> <br />reduction in the estimated average annual yield of water from the project. <br /> <br /> <br />Other contributing factors to the reduction include revised evaporation rate <br /> <br /> <br />estimates and the elimination of the joint-use pool. The average annual <br /> <br /> <br />yield is now estimated at 96,400 acre-feet as compared with an earlier <br /> <br /> <br />estimate of 102,000 acre-feet. <br /> <br />Other items completed as part of preconstruction activity include geologic <br /> <br /> <br />drilling and mapping along the damsite to provide additional foundation <br /> <br /> <br />information for the designers and test pits dug to determine suitability <br /> <br /> <br />of material available for construction of the dam. <br /> <br />Reclamation is consulting with several State and Federal agencies concerning <br /> <br /> <br />various aspects of the Narrows Unit. These include Colorado Division of Parks <br /> <br /> <br />and Outdoor Recreation and National Park Service concerning recreation plans; <br /> <br /> <br />the Colorado Division of Wildlife and U.S. Fish and Wildlife Service concerning <br /> <br /> <br />fish and wildlife issues; Colorado Division of Highways concerning relocation of <br /> <br /> <br />roads within the project area; and the Army Corps of Engineers concerning flood <br /> <br /> <br />control issues. State officials from Nebraska and Colorado were also briefed <br /> <br /> <br />concerning the Narrows Unit flood control benefits and storage capacity. <br /> <br />Reclamation and conservancy district representatives met with a large number <br /> <br /> <br />of civic groups and local government entities concerning the status of the <br /> <br /> <br />prOject and activities scheduled to ready the project for construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.