My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08420
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08420
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:06 PM
Creation date
10/12/2006 2:58:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.14.D
Description
UCRBRIP Biology Committee
State
CO
Basin
Colorado Mainstem
Date
1/1/1995
Author
CWCB
Title
Biology Committee Review of Scopes of Work
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />, <br />..J <br /> <br />IV. Area (i,e. Location): <br /> <br />Throughout the Colorado River Basin in the States of Utah, Colorado, and <br />Wyoming. <br /> <br />Task 1 - <br /> <br />V. Methods/Approach: <br /> <br />Task 2 - <br /> <br />Task 3 - <br /> <br />Task 4 - <br /> <br />Establish a team of 5 biologists (one from each State and 2 <br />from the Service) with the mission of reviewing each fish <br />stocking proposal per the established "interim" procedures <br />and formulate approaches and address logistics of field <br />visits and proposal adequacy prior to receiving proposals, <br /> <br />Review adequacy of information provided in each stocking <br />proposal. Identify and report on inadequacies to the <br />stocking proponent for completion/modification, <br /> <br />Conduct site visits and data reviews and reach team <br />conclusions and recommendations for each stocking proposal, <br />While the goal is to reach consensus recommendations, the <br />individuals on the team are expected to represent their <br />agency and proposals are expected to be funneled through the <br />specific review steps outlined in the interim procedures, <br /> <br />Identify shortcomings (biological, political, process) <br />of the interim procedures and make recommendations to <br />correct them, <br /> <br />Task 1 - <br /> <br />VI, Task Description and Approximate Schedule: <br /> <br />Task 2 - <br /> <br />Task 3 - <br /> <br />Task 4 - <br /> <br />VII, Deliverables: <br /> <br />Establish Team and <br />adopt process for <br />review, <br /> <br />June IS, 1994 <br /> <br />Review proposals <br /> <br />July I - Oct.. 30, 1995 <br /> <br />Conduct site visits <br />and make recommendations <br />re: each proposal, July 1 - Nov, 30, 1995 <br /> <br />Recommend modifications <br />to Procedures Nov. 30, 1994 - Mar, 1, 1995 <br /> <br />- Review comments submitted regarding each stocking proposal, <br /> <br />- Report that identifies strengths and shortcomings of interim <br />procedures and recommends modifications to finalize the procedures, <br />
The URL can be used to link to this page
Your browser does not support the video tag.