My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08399
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:01 PM
Creation date
10/12/2006 2:58:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
10/22/1998
Title
Briefing Paper on Grand Canyon Adaptive Management Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br />~I <br />. <br />'I <br />c <br /> <br />. <br /> <br />. Charter to be renewed every 2 years <br />. Membership: 25 Member Agencies <br />. Meets twice a year (January and July/August/September) <br />. Technical Work Group <br />. Charter: <br />. GoalslPurpose: <br />. Membership: 27 members <br />. Meetings: In the past met for 2 days per month, in the future will meet for <br />2 days every other month <br />AMP Program Issues <br />. Glen Canyon Dam Operating Criteria <br />. Adopted by the Secretary in February 1997 <br />. Include specific operation features: <br />. Maximum Releases: 25,000 cfs <br />. Minimum Releases: 8,000 cfs <br />. Allowable Daily Fluctuations <br />. Maximum Ramping Rates: up ramp <br />down ramp <br />. Emergency Exception Rule <br />. Flood Frequency Reduction Measures <br />. Spillway gate extension at GCD <br />. Operating Criteria will need to be revised in the Dear future to <br />address BHMF, flood control spacelspillway gate extensions <br />. Beach Habitat Maintenance Flows: flows up to power plant <br />capacity (32,000 cfs) <br />. Beach Habitat Building Flows: flows up to 45,000 cfs <br />. Management Objectives and Info Needs <br />. The Management Objectives (M.O.) are a set of goals for managing the <br />Colorado River Ecosystem. Most TWG members recognize that all M.O.s <br /> <br />....~ <br /> <br />f{: <br /> <br />:~ <br /> <br />" <br /> <br />:"1 <br />(.~ <br /> <br />~?, <br />., <br /> <br />1;< <br /> <br />,--'- <br /> <br />~\ <br />,Y <br />;~~ " <br /> <br />.'{ <br /> <br />.,-~: <br /> <br />;:;. <br />'.~ <br />.;'", <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.