My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08399
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:01 PM
Creation date
10/12/2006 2:58:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
10/22/1998
Title
Briefing Paper on Grand Canyon Adaptive Management Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br />\~ <br /> <br />,. <br />:f <br /> <br />. <br /> <br />. Preferred Alternative was the "Modified Low Fluctuating Flow" (a compromise <br />solution to conflicting resource protection interests) None of the resource benefits <br />were optimized; Preferred Alternative was accepted by all parties <br />EIS Recommendations <br />. Implement Preferred Alternative <br />. Establish an Adaptive Management Program for Glen Canyon Dam <br />. Establish an Adaptive Management Work Group <br />. Establish a Technical Work Group <br />. Establish a Grand Canyon Monitoring and Research Center <br />. Establish Beach Habitat Maintenance Flows (up to power plant capacity. 32,000 <br />cfs) <br />. Establish Beach Habitat Building Flows - (flows greater than power plan capacity, <br />up to 45,000 cst) <br />. Protect Endangered Species (SW Willow Flycatcher, Humpback Chub, Razorback <br />Sucker, Kanab Amber Snail, Bald Eagle, Peregrine Falcon) <br />Transition Work Group: The TWG was an informal group organized by Reclamation <br />shortly after the EIS was completed. The Group was operational between the time the <br />EIS was completed and the Record of Decision signed by the Secretary. <br />. Record of Decision was signed by the Secretary in October 1996. It formally <br />implemented the recommendations made in the Final EIS, <br />Adaptive Management Program <br />. Bureau of Reclamation <br />. Has overall management responsibility for program including budget, <br />staffing, etc. <br />. Grand Canyon Monitoring and Research Center (GCMRC) <br />. Responsible for monitoring and research activities <br />. Responsible to the Secretary and the AMWG <br />. Issue: How big should GCMRC be? What should staffing level be? <br />· Adaptive Management work Group <br />. Chartered under the Federal Advisory Commission Act <br /> <br />:1 <br />.~ <br />" <br /> <br />.(. <br /> <br />;"; <br />'(~ <br /> <br />:." <br /> <br />. <br /> <br />,:" <br />;f <br />.,;. <br /> <br />. <br /> <br />~~i <br />.',,' <br />" <br />~i. <br />".f" <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.