My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08399
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:01 PM
Creation date
10/12/2006 2:58:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
10/22/1998
Title
Briefing Paper on Grand Canyon Adaptive Management Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Western Area Power Administration (W AP A) and Colorado River Energy Distributors <br />Association (CREDA) opposed changes in operations and loss of peaking power and <br />impact on power fates. <br />Grand Canyon Protection (GCP) Act passed on September 30, 1992 after several <br />attempts by Congress and interested parties (see Committee Reports @ CWCB and AG <br />[Carol Angel] <br />Key Participants in negotiations included: <br />. Bill McDonald <br />. Jim Lochhead <br />. Upper and Lower Basin States Representatives <br />. CREDAlWAPA <br />. National and Local Environmental Group (very strong participation) <br />. Members of Congress <br />State Issues/Concerns: <br />. Protect water supply function of Lake Powell (major concern) <br />. Protect compact delivery obligation of Upper Basin (major concern) <br />. Maintain integrity of Upper Basin Fund (less of a concern) <br />. Protect availability of projects power fevenues for future CRSP Act projects (less <br />of a concern because it was apparent that future CRSP projects were unlikely to <br />be built) <br />CREDAIW AP A Issues/Concerns <br />. Maintain peaking power functions as much as possible <br />. Minimize power rate increases <br />. Limit cost of EIS (paid for by powef revenues) <br />. Maintain integrity of Upper Basin Fund <br />Environmental Concerns <br /> <br />i,: <br />~ ':~ <br />'. <br />~.,; <br />)i:i <br />~. ., <br />~... ~ <br />~~ <br /> <br />, <br />"' <br /> <br />. <br /> <br />. <br /> <br />>. <br /> <br />.~ <br />f~ <br /> <br />. <br /> <br />""- <br /> <br />, <br />ri'" <br /> <br />. <br /> <br />'.: <br />" <br />'. <br />.- <br /> <br />. <br /> <br />. Protect cultural and natural resources of Colorado River system from future <br />damages and restore ecosystem as much as possible to pre-dam conditions <br />. Key Provisions of GCP Act <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.