My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08399
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08399
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:48:01 PM
Creation date
10/12/2006 2:58:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
10/22/1998
Title
Briefing Paper on Grand Canyon Adaptive Management Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />~ <br />',. <br />j <br /> <br />~: <br /> <br />Briefing Paper on Grand Canyon <br />Adaptive Management Program <br />October 22, 1998 <br /> <br />Adaotive Management Program Background <br /> <br />. Glen Canyon Dam (GCD) was authorized in the 1956 Colorado River Storage Project <br />(CRSP) Act <br />. Glen Canyon Dam was completed in 1963 <br />. Glen Canyon Dam was operated under the CRSP Act, CRBP Act and the Long Range <br />Operating Criteria <br />. The CRSP Act (Sec. 7) directed that oeD be operated "so as to produce the greatest <br />practicable amount of power and energy..," (peaking power operations) <br />. GeD was operated primarily for peaking power, from 1963 to resulting in rapid and <br />high fluctuations of flow <br />. Reclamation planned to uprate the power plant in 1982 and was required to conduct <br />environmental studies pursuant to NEP A <br />. Phase I Studies 1982 - 1988 <br />. Phase II Studies 1988- <br />. Phase I Studies claimed significant adverse environmental impacts to Colorado River <br />resources downstream from the Dam <br />Basin States Response to the Phase I Studies: <br />. Not enough evidence of adverse impacts <br />. Opposed to further studies <br />. Opposed to changes in Dam Operations <br />. Secretary of the Interior (Lujan) in July 1989 directed that an EIS be prepared on the <br />Operation of GCD, <br />. The Secretary also directed on August 1, 1991 that less destructive "Interim Operations" <br />be implemented; see 1990 AOP, 1991 AOP and 1992 AOP for discussion on Interim <br />Operations. TheSpecifi~\Interim Operations" are described in the 1993 AOP. <br /> <br />~'. : <br /> <br />,. <br /> <br />;.i. <br />~:~; <br />:--: <br />;..~. <br /> <br />I <br /> <br />, . <br /> <br />.-... <br />.:..~ <br />--;.; <br />.:.-:- <br />-"'<" <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.