Laserfiche WebLink
<br />3G Retire 12,000 acres of 6W land, line deteriorated sections <br /> <br />on east side <br /> <br />31 Retire 8,000 acres in northeast, line all deteriorated <br /> <br />sections <br /> <br />3J Retire 12,000 acres of 6W land, no improvements <br /> <br />4 Asphalt lining <br /> <br />SA Plastic-line all canals and laterals <br /> <br />6 Combine linings - plastic, concrete and pipe <br /> <br />7A Earth-line all canals and laterals <br /> <br />7B Combination earth lining and piping <br /> <br />8A Sprinkler irrigate all irrigated land <br /> <br />8B Sprinkler irrigate 70 percent of irrigated land, line all <br /> <br />canals and laterals <br /> <br />9 Onfarm and irrigation management <br /> <br />10 Desalting plant <br /> <br />11 Sealants: Enzyme, gel, and chemical <br /> <br />l2 Limit diversions <br /> <br /> <br />In September 1979, after several public meetings over a period of 3 <br /> <br /> <br />years, the public's recommendation for a plan of action was obtained. At <br /> <br /> <br />this meeting, January 1979 cost estimates were displayed for candidate <br /> <br />001688 <br /> <br />17 <br />