Laserfiche WebLink
<br />PLAN FORMULATION <br /> <br />A number of alternatives were considered in the plan formulation <br /> <br />process and presented during public meetings. The most acceptable alter- <br /> <br />natives include concrete lining, earth lining, plastic lining, land <br /> <br />retirement, and sprinkler irrigation in combination with lining. Others, <br /> <br />perceived as less acceptable and also not meeting criteria for effi- <br /> <br />ciency, were asphalt lining, desalinization, sprinkler irrigation, seal- <br /> <br />ants, limitation of diversions, and irrigation management. <br /> <br />Alternatives <br /> <br />The 21 alternatives listed below were considered before selecting a <br /> <br />recoDDDended plan. Appraisal-level economic analyses, input from public <br /> <br />meetings, and criteria and standards discussed in a later section, <br /> <br />narrowed that number to five - 0, lA, lD, lF, and 7A. <br /> <br />Alternative <br /> <br />Action considered <br /> <br />o Future without project. Continue rehabilitation <br /> <br />and betterment and OM&R. <br /> <br />lA Concrete-line all canals and laterals <br /> <br />lD Concrete-line east side canals and laterals <br /> <br />IF Concrete-line all deteriorated sections <br /> <br />2 Combine portion of east canal with Selig Canal <br /> <br />3C Retire 12,000 acres of 6W land, concrete-line all canals <br /> <br />and laterals <br /> <br /> <br />Retire 12,000 acres of 6W land, line deteriorategqtc~i~n? <br /> <br />3F <br /> <br />16 <br />