My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08382
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08382
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:55 PM
Creation date
10/12/2006 2:57:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
5
Date
2/13/1963
Author
H P Dugan
Title
Data on Ruedi Reservoir
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.'. ,. <br /> <br />f' <br />I <br /> <br />(' <br />l <br />! <br />, <br />I <br /> <br />r <br />~ <br />, <br />, <br />, <br /> <br />. <br /> <br />. <br /> <br />0960 <br /> <br />These investigations guided us in a determination of our drilling program. <br />By the first week in November, we assembled drill crews and equipment at <br />Ruedi Reservoir and began our subsurface investigations. Since that time, <br />we have had six drill crews operating three drill rigs two shifts per day, <br />excluding Sunday. Our operations were curtailed during the Christmas <br />holidays. <br /> <br />The fOllowing tabulation sunnnarizes our drilling to date: <br /> Drill Hole 1-62 491-foot depth Completed (vertical hole) <br /> Drill Hole 2-62 630-foot depth Completed (vertical hole) <br /> Drill Hole 3-62 529.l-foot depth Completed (vertical hole) <br /> Drill Hole 3A-62 279.5-foot depth Completed (angle hole) <br /> Drill Hole 3B-62 320.5-foot depth Completed (angle hole) <br /> Drill Hole 4-62 501.6-foot depth Completed (vertical hole) <br /> Drill Hole 5-63 3l0-foot depth Completed (vertical hole) <br /> Drill Hole 6-63 850-foot depth Drilling (vertical hole) <br /> Drill Hole 7-63 Drilling suspended pending completion of Drill <br /> Hole 8 <br /> Dri 11 Hole 8-63 4l5-foot depth Drilling (vertical hole) <br /> <br />The accompanying photograph shows that portion of the reservoir area where <br />we have been drilling. The yellow dots indicate the locations of the holes <br />listed above. The yellow broken line represents the approximate contour <br />of the flow line of the reservoir. The view is to the north and the dam <br />site is off the bottom edge of the photograph toward the left side. <br /> <br />We have had at least one geologist at Ruedi Reservoir continuously since <br />the first of last November. The rock cores have been studied regularly <br />by them and records of each hole prepared, which combined the reports of <br />each driller with the related rock samples stored in the core boxes. Tests, <br />including mineralogical analyses, are in progress on selected samples. The <br />field studies have been supervised and the results of our testing have been <br />constantly reviewed by geologists with long experience in this type of <br />investigation. <br /> <br />Although our explorations of the reservoir geology have not advanced yet to <br />the point where we can draw definite concfusions, we have not encountered <br />any conditions to warrant proposing a change in location of Ruedi Dam and <br />Reservoir. <br /> <br />We intend to drill additional holes and make other geophysical investiga- <br />tions to explore the site thoroughly. All factual information will be <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.