My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08371
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:54 PM
Creation date
10/12/2006 2:57:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100
Description
CRSP
Basin
Colorado Mainstem
Date
12/1/1950
Author
USDOI/BOR
Title
Colorado River Storage Project and Participating Projects, Upper Colorado River Basin, Project Planning Report
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />LIST OF TABLES <br /> <br />Colorado River Storage Project - Descriptive <br />Specifications and Official Cost Estimates of <br />Main Project Units. (). (1 ~ (1 . It . (1 (1 . . . (1 (1 <br /> <br />Page <br /> <br />. . <br /> <br />10 <br /> <br />Construction Costs, Allocations and Acreages _ <br />Colorado River Storage Project and Participating <br /> <br />Projects. (). . (1 (1 .. (1 (1 (1 (1 (1 .. 0 (). (1 It (1 (1 (1 (1 (1 (1 13 <br /> <br />Participating Projects Subject to llUrther Approval <br />and llUrther Authorization by the Congress, and <br />Summa~ of Project Costs. . . It 0 (1 . . It . . . (1 (1 14 <br /> <br />4. <br /> <br />Weather Records at Representative Stations in the <br />Upper Basin Drainage Area It . (1 (1 (). . . (1 (1 (1 ~ . . <br /> <br />5. <br /> <br />Average Stream Flows of the Colorado River and <br />Its Tributaries at Selected Pomnts. . . . . . . <br /> <br />. . <br /> <br />6. <br /> <br />Comp1!ltation of Virgin Flow at Leets Ferry. . . . . <br /> <br />7. <br /> <br />Armus.l Present Modified Flow - Colorado River at <br />Leets Ferry. . . . . It . .. .. . . (). . It . It 0 /!J . It <br /> <br />8. <br /> <br />Net Man-made DepletiOns in the Upper Basin. . . . . <br /> <br />9. <br /> <br />Present Land Use in the Upper Drainage Basin. . <br /> <br />. . <br /> <br />10. <br /> <br />, <br />Distribution of Irrigated Lands in the Upper <br />Drainage Basin. . . ~ ~ . . . . (1 . (}. It 0< .' 11 I) . (I <br /> <br />11. <br /> <br />Summary of Estimates of Normal Unit Consmnptive Use <br />of Water Rates for Irrigated Crops During the <br />Irrigation Period for Areas in the Upper Colorado <br /> <br />River Basin 1) (1 . . . It . It . .. .. G> .. . . . .- . . .. <br /> <br />12. <br /> <br />Present and Future Consumptive Use - Upper BaBin. . <br /> <br />13. <br /> <br />Sediment Enroachment in Project Reservoirs. <br /> <br />It 0' . 4) <br /> <br />14. <br /> <br />Bureau of Reclamation Estimates of Electric Power <br />Requirements and Supply . . . . . . . . . . . . . . <br /> <br />15. <br /> <br />Federal Power COmmission Estimate of Electric <br />Power Requirements and Supply in Market Area for <br />Upper Colorado River Basin Hydroelectric Projects . <br /> <br />16. <br /> <br />Estimated Armual Firm Energy Generation by <br />Project Units (). (1 iii. . () . . . . " 'It It . . " <br /> <br />It (1 . . <br /> <br />-vii- <br /> <br />16 <br /> <br />17 <br />21 <br /> <br />23 <br />24 <br />28 <br /> <br />28 <br /> <br />30 <br />33 <br />34 <br /> <br />37 <br /> <br />38 <br /> <br />40 <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.