Laserfiche WebLink
Colorado Springs/Super Ditch Pilot Project - State Engineer's Determination <br />December 6, 2019 <br />Page 5 of 15 <br />divided by the total number of fallowed shares. The calculation of monthly composite <br />consumptive use factors will be performed for each month from March through November. <br />I I I ! I I I I I , 1 11 11 ! I III I I I I I I I I! I I I I I I I I <br />Note: for certain parcels on the Schweizer farm located near the canal where groundwater levels have <br />been measured at depths of less than 8 feet, the HCU credit may be reduced if and when those parcels <br />are fallowed as described in condition B13. Such a change will require a change to the factors applied <br />for the Schwei7er farm. <br />