My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_2982734
DWR
>
Reference Library
>
2016
>
11
>
DWR_2982734
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:17:16 AM
Creation date
11/16/2016 11:34:40 AM
Metadata
Fields
Template:
Reference Library
Title
ET WORKSHOP 2016: WEATHER DATA FOR ET CALCULATIONS - NORTHERN WATER
Author/Source
MARK CROOKSTON, P.E.
JUNE CAVES
NORTHERN WATER
Keywords
EVAPOTRANSPIRATION, ET, NORTHERN WATER, BIG THOMPSON, WEATHER, STATION, COAGMET, CALIBRATION
Document Type - Reference Library
Presentations
Document Date
10/13/2016
Year
2016
Team/Office
Modeling
Tags
DWR Re-OCR
Description:
Signifies Re-OCR Process Performed on or after 10/6/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Colorado – Big Thompson Project <br /> <br />$160 million <br />construction cost <br />12 <br />reservoirs/lakes 3 pumping plants <br />7 hydro-electric <br />power plants <br />99 miles (160 km) <br />of canals <br />693,000 <br />irrigated acres <br />(280,000 ha) <br />220,000 ac-ft <br />(270 m3 x106) <br />average annual <br />deliveries <br />$370 <br />million/year <br />agricultural <br />production <br />721,000 <br />population
The URL can be used to link to this page
Your browser does not support the video tag.