Laserfiche WebLink
CARRIAGE HILLS NO. 2 DAM, Dam Failure Forensic Investigation Report Page 1  <br />February 27, 2015  <br />CARRIAGE HILLS NO. 2  DAM (DAMID 040110)  <br />SEPTEMBER 2013 DAM FAILURE FORENSIC INVESTIGATION REPORT  <br />Colorado Division of Water Resources, Dam Safety Branch  <br />  <br />1. REFERENCES  <br />1. Dam Failure Investigation Guideline, ASDSO, Dec. 8, 2011.  <br />2. Exceedance Probability Analysis for the Colorado Flood Event, Sept. 9‐16, 2013, NOAA NDSC, Sept. 17,  <br />2013  <br />3. Colorado Front Range Flood of 2013: Peak Flow Estimates at Selected Mountain Stream Locations, NRCS,  <br />Dec. 2013.   <br />4. Public Communications Guide, Colorado Rains and Flood, 2013, USBR, Updated October 21, 2013.  <br />5. Peak Discharge Indirect Measurements of the September 11‐13, 2013 flood for Selected Streams along  <br />the Colorado Front Range, Technical Memorandum No. 86‐6833000‐2014‐24, USBR, June 2014.  <br />6. Hydrologic Evaluation of the Big Thompson Watershed, Post September 2013 Flood Event, Colorado  <br />Department of Transportation, prepared by Jacobs, August 2014.  <br />7. Fish Creek Hydrology  Report, prepared by Matrix Design Group, August 2014.  <br />  <br />2.  SCOPE & PURPOSE      <br />The purpose of this report is to document the failure of the Carriage Hills No. 2 Dam, which occurred during the  <br />September 2013 floods, with respect to the following:  possible causes of the failure, possible damages from the  <br />breach floodwave, and lessons that can be learned to help avoid future dam failures.  The scope of the study  <br />included review of State Engineer’s Office (SEO) construction & dam safety inspection files, post‐failure field  <br />inspection and surveys of the dam breach and stream channel high water marks, review of processed rain data,  <br />review of previous studies, associated analysis and discussion, and report documentation.     <br />  <br />The SEO Dam Safety Branch (DSB) assigns dams to an individual Dam Safety Engineer (DSE) in a region, who is  <br />then primarily responsible for inspecting his/her assigned dams and enforcing state dam safety regulations  <br />there.  In order to provide an independent review in accordance with Reference 1, this dam failure forensic  <br />study was performed by a member of DSB staff not previously associated with the inspection or regulation of  <br />the Carriage Hills No. 2 Dam.   <br />  <br />3. BACKGROUND  <br />The Carriage Hills No. 2 Dam (DAMID 040110) is classified by the DSB as a Low Hazard, Minor Size dam.  The DSB  <br />assigns hazard classification based on a “sunny day” failure scenario, absent flooding.  The dam reportedly  <br />overtopped and failed during the September 2013 widespread catastrophic flooding in Northern Colorado.  The  <br />storm was an unusual, late season event whereby warm moisture and upslope winds allowed up to 16‐17 inches  <br />of rain to fall at elevations as high as 10,000 ft.  The rain event did not have unusually high rain intensity, but had  <br />a long duration and high volume.  It caused extensive flooding throughout Northern Colorado.  <br />The Carriage Hills No. 1 & No. 2 Dams are owned by the Town of Estes Park.  They are located in the Carriage  <br />Hills subdivision approximately 2‐1/4 miles southeast of downtown Estes Park.   The dams lie in series on an