Laserfiche WebLink
Mr. Dick Wolfe, P.E. <br />Mr. Steve Witte, P.E. <br />Mr. Bill Tyner, P.E. <br />March 1, 2015 <br />Page 2 of 4 <br />Table 1 <br />Fallowed Shares, Acreage & Parcel IDs <br />The "Pilot Project Fallowed Acreage" column represents the dry-up claimed for the Catlin Pilot Project. Note that slight changes in the <br />final dry-up acreage necessitate revision of Table 1 - Percent of Total Delivery for Return Flow Replacement, previously provided with the <br />HB 13 -1248 Catlin (Fallowing - Leasing) Pilot Project - Pay As You Go Analysis submitted to the State and Division Engineers on February <br />17, 2015. <br />The "Measured Fallowed Fields" column represents the acreage of the dry-up parcels. <br />In response to (b), the non - fallowed shares will be used on the remaining non - fallowed Catlin <br />Pilot Project lands illustrated on the attached maps via surface irrigation, and none of the Catlin Pilot <br />Project lands will be used as dry -up in a Rule 14 plan excepting as allowed for the City of Fowler <br />under the approval terms and conditions. <br />In response to (c) the remainder of the Catlin Pilot Project shares and Fry -Ark Project water <br />will be used on the non - fallowed Catlin Pilot Project lands illustrated on the attached maps. <br />Term and Condition No. 6 is as follows. <br />Dry -up of the fallowed fields shall comply with the "Operating Procedures for Administration <br />of Parcels Claimed for Augmentation Credits" of the State Engineer's Office, except that signs <br />shall be installed by March I of each plan year on all parcels identified in that notice provided <br />pursuant to term and condition 4, above. Re- irrigation of dry -up parcels shall not be allowed <br />by any other source of water including other surface water, Catlin shares, or ground water <br />during the year in which such parcel is fallowed in Pilot Project operations. No partial year <br />dry -up shall be permitted. <br />The irrigators are installing the required signs. The dry -up parcels will not be irrigated during <br />the 2015 calendar year. <br />Term and Condition No. 13 is as follows. <br />To the extent it is determined that the Subject Shares and the associated lands available for <br />fallow have been included in a Rule 14 Plan(s) such that they are no longer legally available <br />Martin and Wood Water Consultants, Inc. <br />Pilot <br />Measured <br />Shares <br />Project <br />Farm Name <br />Fallow <br />Fallowed <br />Fallow <br />Fields <br />Fallowed Parcels <br />Acreage <br /># <br />acres <br />acres <br />Parcel ID <br />Schweizer <br />48.56 <br />47.8 <br />47.8 <br />22573220, 22573225 & 22573228 <br />Diamond A West <br />63.59 <br />36.1 <br />37.2 <br />24561101 & 24561102 <br />Hirakata Farms <br />45.04 <br />42.8 <br />42.8 <br />23562808, 23562823, 23562834 & a portion of 23562813 <br />Hancock <br />24.52 <br />22.7 <br />22.7 <br />24560711 & most of 245607022 <br />Diamond A East <br />81.90 <br />76.3 <br />88.7 <br />23570414 & 23570415 <br />Hanagan <br />33.69 <br />32.8 <br />32.8 <br />Most of 23563603 <br />Total <br />297.3 <br />258.4 <br />271.9 <br />The "Pilot Project Fallowed Acreage" column represents the dry-up claimed for the Catlin Pilot Project. Note that slight changes in the <br />final dry-up acreage necessitate revision of Table 1 - Percent of Total Delivery for Return Flow Replacement, previously provided with the <br />HB 13 -1248 Catlin (Fallowing - Leasing) Pilot Project - Pay As You Go Analysis submitted to the State and Division Engineers on February <br />17, 2015. <br />The "Measured Fallowed Fields" column represents the acreage of the dry-up parcels. <br />In response to (b), the non - fallowed shares will be used on the remaining non - fallowed Catlin <br />Pilot Project lands illustrated on the attached maps via surface irrigation, and none of the Catlin Pilot <br />Project lands will be used as dry -up in a Rule 14 plan excepting as allowed for the City of Fowler <br />under the approval terms and conditions. <br />In response to (c) the remainder of the Catlin Pilot Project shares and Fry -Ark Project water <br />will be used on the non - fallowed Catlin Pilot Project lands illustrated on the attached maps. <br />Term and Condition No. 6 is as follows. <br />Dry -up of the fallowed fields shall comply with the "Operating Procedures for Administration <br />of Parcels Claimed for Augmentation Credits" of the State Engineer's Office, except that signs <br />shall be installed by March I of each plan year on all parcels identified in that notice provided <br />pursuant to term and condition 4, above. Re- irrigation of dry -up parcels shall not be allowed <br />by any other source of water including other surface water, Catlin shares, or ground water <br />during the year in which such parcel is fallowed in Pilot Project operations. No partial year <br />dry -up shall be permitted. <br />The irrigators are installing the required signs. The dry -up parcels will not be irrigated during <br />the 2015 calendar year. <br />Term and Condition No. 13 is as follows. <br />To the extent it is determined that the Subject Shares and the associated lands available for <br />fallow have been included in a Rule 14 Plan(s) such that they are no longer legally available <br />Martin and Wood Water Consultants, Inc. <br />