My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_2714202
DWR
>
Division Filing
>
2015
>
02
>
DWR_2714202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2015 3:16:52 PM
Creation date
2/20/2015 3:16:44 PM
Metadata
Fields
Template:
Division Filing
Document Date
2/17/2015
Document Type - Division Filing
Report/Study
Division
2
WDID
1707700
Subject
PILOT PROJECT - CATLIN CANAL 2-17-2015 SUBMITTAL
DWR Send/Recipient
BILL TYNER
Outside Send/Recipient
CRAIG LIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dick Wolfe, P.E. <br />Mr. Steve Witte, P.E. <br />Mr. Bill Tyner, P.E. <br />February 17, 2015 <br />Page 3 of 4 <br />The above diagram illustrates the variability in deep percolation deliveries that <br />succeeds in meeting the 10 acre -feet per month limit described above, the sum of which must <br />naturally equal 100 %. For example, Augmentation Station deep percolation deliveries of <br />15 %, Schweizer Recharge Pond deep percolation deliveries of 30 %, and Hanagan Recharge <br />Pond deep percolation deliveries of 55 %, which total 100 %, meet the 10 acre -feet per month <br />limit. The target deep percolation deliveries will likely be set near the middle of each range to <br />assist in mitigating the expected difference in desired and actual deliveries to the approved <br />delivery points. <br />The following table, based on the above distribution of deliveries and the results of the <br />revised LFT, provides the total return flow, including deep percolation and tailwater, as a <br />percentage of total delivery, including deliveries to the augmentation stations and recharge <br />ponds. <br />Table 1 <br />Percent of Total Delivery for Return Flow Replacement <br />Month <br />Augmentation <br />Stations <br />Schweizer <br />Recharge Pond <br />Hanagan <br />Recharge Pond <br />Total <br />January <br />0% <br />to <br />0% <br />0% <br />to <br />0% <br />0% <br />to <br />0% <br />0% <br />February <br />0% <br />to <br />0% <br />0% <br />to <br />0% <br />0% <br />to <br />0% <br />0% <br />March <br />26% <br />to <br />33% <br />18% <br />to <br />29% <br />29% <br />to <br />40% <br />91% <br />April <br />24% <br />to <br />31% <br />17% <br />to <br />27% <br />27% <br />to <br />38% <br />86% <br />May <br />19% <br />to <br />25% <br />14% <br />to <br />22% <br />22% <br />to <br />30% <br />68% <br />June <br />14% <br />to <br />18% <br />10% <br />to <br />16% <br />16% <br />to <br />22% <br />51% <br />July <br />14% <br />to <br />18% <br />10% <br />to <br />16% <br />16% <br />to <br />22% <br />49% <br />August <br />14% <br />to <br />18% <br />10% <br />to <br />16% <br />16% <br />to <br />22% <br />50% <br />September <br />17% <br />to <br />22% <br />12% <br />to <br />20% <br />20% <br />to <br />27% <br />62% <br />October <br />23% <br />to <br />29% <br />16% <br />to <br />26% <br />26% <br />to <br />36% <br />81% <br />November <br />24% <br />to <br />30% <br />17% <br />to <br />27% <br />27% <br />to <br />37% <br />84% <br />December <br />0% <br />to <br />0% <br />0% <br />to <br />0% <br />0% <br />to <br />0% <br />0% <br />Please contact us if you have any questions or any additional information is needed <br />for your review of this "pay as you go" analysis. <br />Martin and Wood Water Consultants, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.