Laserfiche WebLink
ADMINISTRATION GUIDELINE <br />Administration Number (aka Holt Number) <br />Division One — South Platte River <br />The "Admin Number" was developed by the Division of Water Resources (Ken Holt, Division 6 <br />hydrographer) to provide a simple ranking of water rights' priorities. The number references the number <br />of days since December 31, 1849, an entirely arbitrary date except for the fact that it is prior to the most <br />senior Colorado water right. <br />The Admin Number requires the following data: <br />• Adjudication Date of the subject water right' <br />• Previous Adjudication Date' <br />• Appropriation Date of the subject water right <br />The Admin Number is in the form: XXXXX.YYYYY <br />The left side of the number (XXXXX) is the number of days between December 31, 1849 and the latter of <br />the Previous Adjudication Date and the Appropriation Date. <br />• If the Appropriation Date is later than the Previous Adjudication Date, then the left side of the <br />Admin Number (XXXXX) is the number representing the Appropriation Date and the right side <br />(YYYYY) is five zeroes ("00000"). <br />• If the Appropriation Date is earlier than the Previous Adjudication Date, then the left side of the <br />Admin Number (XXXXX) is the number representing the Previous Adjudication Date and the right <br />side (YYYYY) is the number that represents the Appropriation Date. <br />Once the left and right sides of the Admin Number are determined, the Admin Number should be viewed <br />as a single number with 10 significant digits; the smaller the Admin Number, the more senior the water <br />right. There are basically three categories of Admin Numbers. <br />Original" adjudications (no Previous Adjudication Date exists): <br />Lower Boulder Ditch Admin No <br />Adj Date 06/02/1882 3561.00000 <br />Previous Adj Date None 1 <br />Appropriation Date 10/01/1859 <br />2. Supplemental adjudications (a previous adjudication exists) with an Appropriation Date later than <br />the Previous Adjudication Date: <br />Beaver Brook Pipeline Admin No <br />Adj Date 05/13/1936 24745.00000 <br />Previous Adj Date 10/09/1895 1 <br />Appropriation Date 10/01/1917 <br />3. Supplemental adjudications with an Appropriation Date earlier than the Previous Adjudication <br />Date: <br />Barnes Meadow Reservoir Admin No <br />Adj Date 12/18/1945 26409.26135 <br />Previous Adj Date 04/22/1922 t <br />Appropriation Date 07/22/1921 <br />Administration Guideline — Admin Number <br />July 28, 2009 <br />