My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3539610
DWR
>
Division Filing
>
2019
>
12
>
DWR_3539610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:17:50 PM
Creation date
12/9/2019 1:17:47 PM
Metadata
Fields
Template:
Division Filing
Document Date
11/20/2019
Document Type - Division Filing
Correspondence
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 LAWMA REDLINE COMMENTS ON DRAFT CONFERENCE REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Super Ditch shall immediately notify the Division Engineer in writing and take such corrective action as is required by the Division Engineer. Fallowed parcels shall be subject to inspection <br /> by the Division Engineer who shall inform the pilot project sponsor if noncompliance is found. <br />Prior to any Pilot Project operations, Super Ditch will ensure that all participating farmers are contractually bound to provide for weed control and erosion protection for the lands <br /> removed from irrigation as a part of the Pilot Project. This will include the acknowledgement of, and agreement to comply with applicable County code noxious weed management requirements, <br /> including the Otero County Noxious Weed Management Plan, Otero County Code, Chapter 12 – Vegetation. Weed control and erosion protection must be accomplished in a manner that does <br /> not include the tillage of the soil that would result in the potential increase in loss of soil moisture. <br />[LAWMA has requested additional terms and conditions related to this issue that are included in the Unresolved Terms and Conditions section.] <br />Tailwater return flow obligations shall be calculated daily and shall be replaced by delivery of the Subject Shares at the augmentation station(s). Applicants shall endeavor to replace <br /> the daily calculated amount of tailwater return flow obligation on a daily basis. Applicants shall demonstrate that all monthly tailwater return flow obligations have been replaced <br /> each month. <br />Lagged deep percolation return flow obligations shall be calculated daily and shall be replaced exclusively through: (a) delivery to the Pilot Project Catlin Canal shares at the augmentation <br /> station(s) and/or (b) other sources of water decreed for augmentation or replacement or approved for augmentation or replacement by a C.R.S. 37-92-308(4) SWSP. From March 15 through <br /> November 14 return flows will generally be replaced with deliveries to the augmentation station, though other approved sources as described herein may be used for such replacement. <br /> During the irrigation season, on a monthly basis, Applicants shall demonstrate that all lagged deep percolation return flow obligations have been replaced. During November 15 to March <br /> 14, replacement of lagged deep percolation return flow obligations may be aggregated as approved by the Division Engineer in accordance with Exhibit M of the decree in Case No. 12CW94 <br /> so long as there is no injury to the Winter Water Storage Program, Colorado water rights, Conservation Storage in John Martin Reservoir or the Kansas-Colorado Arkansas River Compact. <br /> When the Catlin Canal is diverting water, return flows will generally be replaced with deliveries to the augmentation station, though other approved sources as described herein may <br /> be used for such replacement. When the Catlin Canal is not diverting water return flows will be replaced with sources available to CS-U as described herein.
The URL can be used to link to this page
Your browser does not support the video tag.