Laserfiche WebLink
Winter Water available in Pueblo Reservoir for this Pilot Project during that year. <br />All of Applicants’ Winter Water shall be delivered through the Catlin Canal during the period of March 15 through November 14, at the same time as deliveries of Winter Water are made <br /> to Catlin shareholders. Any Winter Water stored in Pueblo Reservoir under this Pilot Project will be stored pursuant to the applicable rules and regulations in effect from time to time <br /> for storage of Winter Water. <br />To the extent that the Pilot Project stores the net depletion amount of the participating shares in Pueblo Reservoir, such water may be booked over to replace return flow obligations <br /> that are owed to Winter Water Storage Program participant structures during the Winter Water storage period on a monthly or weekly basis, or as otherwise required by the Division Engineer, <br /> to participants in the Winter Water Storage Program as necessary to prevent injury to the water rights included in that Program. The Division Engineer will utilize Exhibit M of the <br /> decree in Case No. 12CW94 to determine the amount of the return flow obligation that is owed to John Martin Reservoir. The Division Engineer will be required to make Winter Water releases <br /> from Pueblo Reservoir or other reservoirs upstream from John Martin Reservoir to deliver Winter Water to John Martin Reservoir, or to water users downstream of the confluence of the <br /> Arkansas River and Timpas Creek, Super Ditch will pay the assessed transit loss for delivery of such water to the confluence of the Arkansas River and Timpas Creek, up to the full amount <br /> of the non-irrigation season return flow obligation owed by Super Ditch for the applicable non-irrigation season. <br />Prior to operation of the Pilot Project, Applicants shall provide proof to the Division Engineer and the commenting parties that all agreements and approvals necessary for the operation <br /> of the Pilot Project have been obtained. <br />Prior to March 1 of each year, Applicants shall prepare and submit to the Division Engineer a monthly projection for the replacement of surface and lagged return flow obligations owed <br /> for deliveries to date and projected for the upcoming plan year and for total future monthly obligations over the lagged return flow period. This projection shall be available to all <br /> interested parties through the posting to an FTP site or other accessible website within 14 days of submittal to the Division Engineer. <br />Applicants shall annually prepare a report of Pilot Project operations on or before January 15 of the year following each of the three years that the Pilot Project is operated to deliver <br /> water to CS-U for municipal use. Such report must be submitted to the CWCB and the State and Division Engineers, and will reflect a reporting year of November 16 of the prior plan <br /> year through November 15 of the current plan year for which the report is being prepared.