My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3539603
DWR
>
Division Filing
>
2019
>
12
>
DWR_3539603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:16:37 PM
Creation date
12/9/2019 1:16:35 PM
Metadata
Fields
Template:
Division Filing
Document Date
11/14/2019
Document Type - Division Filing
Correspondence
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 DRAFT CONFERENCE REPORT FROM APPLICANT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Pueblo Reservoir, or such other storage space that Applicants obtain all necessary approvals to utilize. If no excess capacity storage is available in a given year, Applicants will <br /> not have Winter Water available in Pueblo Reservoir for this Pilot Project during that year. <br />All of Applicants’ Winter Water shall be delivered through the Catlin Canal during the period of March 15 through November 14, at the same time as deliveries of Winter Water are made <br /> to Catlin shareholders. Any Winter Water stored in Pueblo Reservoir under this Pilot Project will be stored pursuant to the applicable rules and regulations in effect from time to time <br /> for storage of Winter Water. <br />To the extent that the Colorado Springs/Super Ditch Pilot Project stores the net depletion amount of the participating shares in Pueblo Reservoir, such water may be booked over to replace <br /> return flow obligations that are owed to Winter Water Storage Program participant structures during the Winter Water storage period on a monthly or weekly basis, or as otherwise required <br /> by the Division Engineer, to participants in the Winter Water Storage Program as necessary to prevent injury to the water rights included in that Program. If the Division Engineer is <br /> required to make Winter Water releases from Pueblo Reservoir or other reservoirs upstream from John Martin Reservoir to deliver Winter Water to John Martin Reservoir, or to water users <br /> downstream of the confluence of the Arkansas River and Timpas Creek, CAA will pay the assessed transit loss for delivery of such water to the confluence of the Arkansas River and Timpas <br /> Creek, up to the full amount of the non-irrigation season return flow obligation owed by CAA for the applicable non-irrigation season. <br />Prior to operation of the Pilot Project, Applicants shall provide proof to the Division Engineer that all agreements and approvals necessary for the operation of the Pilot Project have <br /> been obtained. <br />Prior to March 1 of each year, Applicants shall prepare and submit to the Division Engineer a monthly projection for the replacement of surface and lagged return flow obligations owed <br /> for deliveries to date and projected for the upcoming plan year and for total future monthly obligations over the lagged return flow period. This projection shall be available to all <br /> interested parties through the posting to an FTP site or other accessible website within a reasonable time of submittal to the Division Engineer. <br />Applicants shall annually prepare a report of Pilot Project operations on or before January 15 of the year following each of the three years that the Pilot Project is operated to deliver <br /> water to Colorado Springs Utilities for municipal use. Such report must be submitted to the CWCB and the State and Division Engineers, and will reflect a reporting year of November <br /> 16 of the prior plan year through November 15 of the current plan year for which the report is
The URL can be used to link to this page
Your browser does not support the video tag.