My WebLink
|
Help
|
About
|
Sign Out
Home
Search
DWR_3539603
DWR
>
Division Filing
>
2019
>
12
>
DWR_3539603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:16:37 PM
Creation date
12/9/2019 1:16:35 PM
Metadata
Fields
Template:
Division Filing
Document Date
11/14/2019
Document Type - Division Filing
Correspondence
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 DRAFT CONFERENCE REPORT FROM APPLICANT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
of lagged deep percolation return flow obligations may be aggregated as approved by the Division Engineer so long as there is no injury to the Winter Water Storage Program, Colorado <br /> water rights, Conservation Storage in John Martin Reservoir or the Kansas-Colorado Arkansas River Compact. When the Catlin Canal is diverting water return flows will be generally be <br /> replaced with deliveries to the augmentation station, though other approved sources as described herein may be used for such replacement. When the Catlin Canal is not diverting water <br /> return flows will be replaced with sources available to Colorado Springs as described herein. <br />The amount of consumptive use credits and return flow obligations and the disposition of consumptive use credit and return flow replacement water shall be calculated on a daily basis. <br /> Such consumptive use credits may be exchanged to Pueblo Reservoir for use by Colorado Springs or to replace Catlin Pilot Project return flows as necessary, or step exchanged to storage <br /> for such uses. Water allocated to replace deep percolation return flows and delivered through Catlin Canal augmentation stations that is in excess of the replacement requirement on <br /> a given day will be allocated as a stream depletion credit. Such depletion credits may be exchanged to Pueblo Reservoir for use by Colorado Springs or to replace Catlin Pilot Project <br /> return flows as necessary, or step exchanged to storage for such uses. <br />Calculations of return flows owed to the river must be updated as needed (at least monthly), based on actual past water availability and estimated future availability. If there is an <br /> under delivery of return flow water in any month this under delivery shall be made up in the subsequent month. <br />Exchange into Pueblo Reservoir may occur only when there is at least 100 cfs of outflow (inclusive of hatchery flows) from Pueblo Reservoir. Such diversions/exchanges may not cause the <br /> outflow from Pueblo Reservoir to be less than 100 cfs. In addition, exchanges will be operated as junior to the City of Pueblo’s recreational in-channel diversion water right awarded <br /> in Case No. 01CW160, and as though the right is in effect 24 hours per day. <br />Any exchange of water as a part of this Pilot Project must be approved in advance by the Division Engineer after a determination that there is sufficient exchange potential to accomplish <br /> the requested exchange without injury to other water rights. Applicants must request to make an exchange through the Arkansas River Dashboard, so long as the Dashboard is functioning <br /> properly. <br />Exchanges completed via the decree for Case No, 10CW04 will comply with all terms and conditions decreed therein. <br />Applicants may operate an exchange only if there is a live stream between the downstream exchange-from point and the upstream exchange-to point.
The URL can be used to link to this page
Your browser does not support the video tag.