My WebLink
|
Help
|
About
|
Sign Out
Search
DWR_3539567
DWR
>
Division Filing
>
2019
>
12
>
DWR_3539567
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:18:21 PM
Creation date
12/9/2019 1:12:28 PM
Metadata
Fields
Template:
Division Filing
Document Date
3/6/2019
Document Type - Division Filing
Correspondence
Division
2
WDID
1707701
Subject
PILOT PROJECT - COLORADO SPRINGS UTILITIES SUPER DITCH HB1248 CWCB BOARD MEMO
DWR Send/Recipient
ALEXANDER FUNK, AGRICULTURAL WATER RESOURCES SPECIALIST
Outside Send/Recipient
CWCB BOARD MEMBERS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br />December 14, 2018 <br /> Via email to Rebecca.Mitchell@state.co.us & Lauren.Ris@state.co.us <br /> <br />Rebecca Mitchell, Director <br />Lauren Ris, Deputy Director <br />Colorado Water Conservation Board <br />1313 Sherman Street, Suite 721 <br />Denver, Colorado 80203 <br /> <br />Re: Tri-State’s Comments re CS-U Pilot Project Proposal for Selection <br /> <br />Dear Ms. Mitchell and Ms. Ris: <br /> <br />Thank you for the opportunity to provide comments regarding the November 16, 2018 <br />proposal (“Proposal”) filed by the Lower Arkansas Valley Super Ditch Company, Inc. (“Super <br />Ditch”) and the City of Colorado Springs, acting by and through its utility enterprise (“CS -U” <br />and collectively, “Applicants”) for an H.B. 13-1248 pilot project involving shares in the Catlin <br />Canal Company, Fort Lyon Canal Company and/or Rocky Ford High Line Canal Company <br />(“CS-U Pilot Project”). I am writing on behalf of Tri-State Generation and Transmission <br />Association, Inc. (“Tri-State”) to submit comments on the Proposal for consideration by the <br />Colorado Water Conservation Board (“CWCB”) pursuant to section II.A of the CWCB’s Criteria <br />and Guidelines for Fallowing-Leasing Pilot Projects dated November 19, 2013 and amended on <br />January 25, 2016 (“Criteria”). <br /> According to the Applicants, the CS-U Pilot Project will rotationally or intermittently <br />fallow parcels of land irrigated by the Catlin, Fort Lyon, or Rocky Ford High Line canals and <br />transfer up to 5,000 acre-feet per year of consumptive use water to Colorado Springs Utilities in <br />Pueblo Reservoir. Super Ditch intends to use a forthcoming decree in Case No. 10CW4 <br />approving appropriative rights of exchange to transfer consumptive use water from the historical <br />irrigation locations to Pueblo Reservoir. The proposed CS-U Pilot Project would operate from <br />January 1, 2020 through December 31, 2029. <br /> <br />Tri-State owns water rights that divert from the Arkansas River in the vicinity and <br />downstream of the proposed CS-U Pilot Project, including shares in the Fort Lyon Canal <br />Company, Amity Mutual Irrigation Company, and Buffalo Canal Company; other well and <br />surface diversion water rights; conditional exchange, groundwater, and storage water rights <br />decreed in Case No. 2007CW74; and shares in the Lower Arkansas Water Management <br />Association. Tri-State is participating in the Pilot Project process to ensure that its water rights <br />are protected from injury and to assist the CWCB and Applicants in demonstrating the viability <br />of non-injurious alternative methods to transfer water rights from agricultural to municipal uses. <br />Tri-State has previously participated cooperatively with Super Ditch in the Catlin Pilot Project
The URL can be used to link to this page
Your browser does not support the video tag.